IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0232 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $300,000 $80,000 Not Implemented
AS0232 # 09 Y:1998 09 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $19,710 $46,000 Not Implemented
IA0200 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,523 $705 Implemented
IA0200 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,997 $12,390 Not Implemented
IA0200 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,751 $2,164 Not Implemented
IA0200 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,340 $2,300 Not Implemented
IA0200 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,154 $2,648 Not Implemented
IA0200 # 06 Y:1998 06 1998 INSTALL OCCUPANCY SENSORS $710 $1,264 Not Implemented
IA0200 # 07 Y:1998 07 1998 ELIMINATE/REDUCE AN OPERATION $64,956 $0 Not Implemented
IA0200 # 08 Y:1998 08 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $278,349 $25,000 Not Implemented
IA0200 # 09 Y:1998 09 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $38,310 $11,590 Not Implemented
IA0200 # 10 Y:1998 10 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $27,121 $4,200 Implemented
CO0423 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $850 $1,000 Not Implemented
CO0423 # 02 Y:1998 02 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $140 $420 Implemented
CO0423 # 03 Y:1998 03 1998 MINIMIZE WATER USAGE $9,100 $11,210 Implemented
CO0423 # 04 Y:1998 04 1998 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $8,870 $2,500 Implemented
CO0423 # 05 Y:1998 05 1998 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT $4,550 $2,000 Implemented
CO0423 # 06 Y:1998 06 1998 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $2,580 $25,000 Implemented
CO0423 # 07 Y:1998 07 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $2,350 $6,900 Implemented
KU0501 # 01 Y:1998 01 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,090 $33,780 Not Implemented
KU0501 # 02 Y:1998 02 1998 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,130 $6,880 Implemented
KU0501 # 03 Y:1998 03 1998 IMPROVE COMBUSTION CONTROL CAPABILITY $2,960 $10,890 Not Implemented
KU0501 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $670 $440 Implemented
KU0501 # 05 Y:1998 05 1998 USE SYNTHETIC LUBRICANT $560 $1,760 Implemented
KU0501 # 06 Y:1998 06 1998 OPTIMIZE PLANT POWER FACTOR $480 $1,470 Not Implemented