IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0017 # 05 Y:2001 05 2001 $540,000 $11,000 Implemented
LM0017 # 06 Y:2001 06 2001 $382,500 $6,000 Not Implemented
LM0022 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,734 $100 Implemented
LM0022 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,848 $164 Not Implemented
LM0022 # 03 Y:2001 03 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $54,047 $450 Implemented
LM0022 # 04 Y:2001 04 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $28,008 $15,300 Not Implemented
LM0022 # 05 Y:2001 05 2001 $57,000 $102,000 Implemented
LE0116 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,897 $0 Implemented
LE0116 # 02 Y:2001 02 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,073 $0 Implemented
LE0116 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,580 $0 Implemented
LE0116 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $239 Implemented
LE0116 # 05 Y:2001 05 2001 USE LESS WASTEFUL PACKAGING $11,666 $0 Not Implemented
LE0116 # 06 Y:2001 06 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $113 $40 Implemented
GT0717 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,765 $16,300 Implemented
GT0717 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $10,500 Implemented
GT0717 # 03 Y:2001 03 2001 COVER OPEN TANKS $17,390 $4,510 Not Implemented
GT0717 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,475 $4,275 Not Implemented
GT0717 # 05 Y:2001 05 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,600 $0 Not Implemented
GT0717 # 06 Y:2001 06 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,465 $67,250 Implemented
GT0717 # 07 Y:2001 07 2001 FILTER AND REUSE HYDRAULIC OIL $1,030 $1,000 Implemented
GT0717 # 08 Y:2001 08 2001 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $6,000 $25,180 Implemented
GT0717 # 09 Y:2001 09 2001 $7,200 $29,314 Implemented
UD0628 # 01 Y:2001 01 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $35,895 $7,000 Not Implemented
UD0628 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,711 $55,200 Not Implemented
UD0628 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $17,969 $9,000 Implemented