IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0852 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,934 $6,000 Implemented
UD0852 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,072 $1,000 Implemented
UD0852 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,716 $5,000 Not Implemented
UD0852 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $94,327 $190,000 Not Implemented
UD0852 # 08 Y:2012 08 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,333 $50,000 Implemented
UD0852 # 09 Y:2012 09 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $27,604 $106,738 Not Implemented
UD0853 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,419 $28,511 Not Implemented
UD0853 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,997 $3,815 Not Implemented
UD0853 # 03 Y:2012 03 2012 REDUCE WATER USE WITH COUNTER CURRENT RINSING $15,738 $600 Not Implemented
UD0853 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,192 $5,500 Not Implemented
UD0853 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $6,272 $6,000 Not Implemented
UD0853 # 06 Y:2012 06 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,059 $7,000 Not Implemented
UD0853 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,012 $1,000 Not Implemented
UD0853 # 08 Y:2012 08 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,506 $1,000 Not Implemented
UD0853 # 09 Y:2012 09 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $974 $2,000 Not Implemented
UD0853 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $402 $1,300 Not Implemented
UD0849 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62,282 $15,816 Not Implemented
UD0849 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,445 $0 Not Implemented
UD0849 # 03 Y:2012 03 2012 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $14,632 $0 Not Implemented
UD0849 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,199 $500 Not Implemented
UD0849 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,530 $1,000 Not Implemented
UD0849 # 06 Y:2012 06 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $34,045 $44,000 Not Implemented
UD0849 # 07 Y:2012 07 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,241 $11,000 Not Implemented
UD0849 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,274 $2,000 Not Implemented
IC0190 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $537 $695 n/a