IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0034 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $294 $192 Not Implemented
KG0033 # 01 Y:1995 01 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $26,990 $5,000 Not Implemented
KG0033 # 02 Y:1995 02 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $10,625 $2,500 Not Implemented
KG0033 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,597 $17,060 Not Implemented
KG0033 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,788 $767 Not Implemented
KG0033 # 05 Y:1995 05 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,330 $2,480 Not Implemented
KG0033 # 06 Y:1995 06 1995 USE SYNTHETIC LUBRICANT $325 $0 Not Implemented
GT0561 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $473,300 $1,050,000 Implemented
GT0561 # 02 Y:1995 02 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $166,370 $235,000 Not Implemented
GT0561 # 03 Y:1995 03 1995 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $99,420 $0 Not Implemented
GT0561 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,950 $4,550 Implemented
GT0561 # 05 Y:1995 05 1995 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS $349,805 $1,000,000 Not Implemented
GT0561 # 06 Y:1995 06 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,730 $201,600 Implemented
AR0064 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,704 $500 Implemented
AR0064 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $694 $1,000 Implemented
AR0064 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $892 $416 Implemented
AR0064 # 04 Y:1995 04 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,234 $1,320 Implemented
AR0064 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,431 $0 Implemented
AR0064 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,972 $12,040 Implemented
AR0064 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,884 $800 Implemented
AR0064 # 08 Y:1995 08 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $4,142 $822 Not Implemented
AR0064 # 09 Y:1995 09 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,852 $3,000 Not Implemented
AR0064 # 10 Y:1995 10 1995 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $53,591 $4,900 Not Implemented
AR0064 # 11 Y:1995 11 1995 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,776 $1,750 Implemented
AR0064 # 12 Y:1995 12 1995 MINIMIZE WATER USAGE $1,104 $100 Implemented