Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0884 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $936 | $500 | Implemented |
UD0884 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,058 | $500 | Implemented |
UD0884 # 07 Y:2013 | 07 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,470 | $0 | Implemented |
UD0884 # 08 Y:2013 | 08 | 2013 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,876 | $0 | Implemented |
UD0884 # 09 Y:2013 | 09 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,533 | $2,000 | Implemented |
UD0884 # 10 Y:2013 | 10 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,365 | $11,824 | Implemented |
UD0884 # 11 Y:2013 | 11 | 2013 | AVOID FROST FORMATION ON EVAPORATORS | $1,417 | $0 | Implemented |
UD0884 # 12 Y:2013 | 12 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,101 | $0 | Implemented |
NC0485 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,649 | $108,665 | Implemented |
NC0485 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $2,016 | $7,315 | Implemented |
NC0485 # 03 Y:2013 | 03 | 2013 | USE PHOTOCELL CONTROLS | $2,647 | $3,750 | Implemented |
NC0485 # 04 Y:2013 | 04 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $167,046 | $6,100 | Implemented |
NC0485 # 05 Y:2013 | 05 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,936 | $300 | Not Implemented |
NC0485 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,809 | $100 | Implemented |
NC0485 # 07 Y:2013 | 07 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $148,178 | $100,000 | Not Implemented |
NC0485 # 08 Y:2013 | 08 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,938 | $75,000 | Not Implemented |
SD0469 # 01 Y:2013 | 01 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $37,421 | $53,250 | Implemented |
SD0469 # 02 Y:2013 | 02 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $23,156 | $8,740 | Not Implemented |
SD0469 # 03 Y:2013 | 03 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $15,384 | $50,200 | Not Implemented |
SD0469 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,246 | $10,350 | Not Implemented |
SD0469 # 05 Y:2013 | 05 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,014 | $15,500 | Not Implemented |
SD0469 # 06 Y:2013 | 06 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,769 | $7,320 | Not Implemented |
SD0469 # 07 Y:2013 | 07 | 2013 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,825 | $1,500 | Not Implemented |
SD0469 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,817 | $600 | Not Implemented |
SD0469 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,250 | $200 | Implemented |