IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0122 # 02 Y:1997 02 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $884 $468 Not Implemented
NC0122 # 03 Y:1997 03 1997 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $831 $1,000 Not Implemented
NC0122 # 04 Y:1997 04 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,262 $600 Not Implemented
NC0122 # 05 Y:1997 05 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,108 $3,500 Not Implemented
NC0122 # 06 Y:1997 06 1997 REPLACE BOILER $8,881 $36,000 Not Implemented
NC0122 # 07 Y:1997 07 1997 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $973 $1,500 Implemented
NC0122 # 08 Y:1997 08 1997 TREAT AND REUSE RINSE WATERS $12,101 $2,500 Not Implemented
NC0122 # 09 Y:1997 09 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $27,463 $13,500 Not Implemented
NC0122 # 10 Y:1997 10 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,157 $400 Implemented
NC0122 # 11 Y:1997 11 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $36,445 $100,000 Not Implemented
UM0094 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $706 $1,185 Implemented
UM0094 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,560 $22,835 Not Implemented
UM0094 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,236 $1,000 Not Implemented
UM0094 # 04 Y:1997 04 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,407 $2,520 Not Implemented
UM0094 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $18,874 $7,590 Implemented
UM0094 # 06 Y:1997 06 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,600 $0 Not Implemented
UM0094 # 07 Y:1997 07 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $37,500 $2,500 Not Implemented
UM0093 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,091 $2,882 Implemented
UM0093 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,272 $9,062 Implemented
UM0093 # 03 Y:1997 03 1997 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,065 $36,247 Not Implemented
UM0093 # 04 Y:1997 04 1997 USE LESS WASTEFUL PACKAGING $4,000 $0 Not Implemented
UM0093 # 05 Y:1997 05 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $24,320 $24 Not Implemented
GT0624 # 01 Y:1997 01 1997 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,995 $4,380 Implemented
GT0624 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,420 $900 Implemented
GT0624 # 03 Y:1997 03 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,480 $150 Implemented