IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,529

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0742 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $248 $475 Implemented
GT0742 # 05 Y:2002 05 2002 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $706 $0 Implemented
GT0739 # 01 Y:2002 01 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $19,440 $122,500 Not Implemented
GT0739 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,592 $1,900 Implemented
GT0739 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,450 $50,177 Implemented
GT0739 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $186 $16,560 Not Implemented
GT0739 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,700 $300 Implemented
GT0739 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,130 $7,000 Not Implemented
GT0739 # 07 Y:2002 07 2002 UPGRADE CONTROLS ON COMPRESSORS $3,488 $0 Implemented
GT0739 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $658 $500 Implemented
GT0740 # 01 Y:2002 01 2002 UPGRADE CONTROLS ON COMPRESSORS $1,545 $0 Implemented
GT0740 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,056 $2,500 Implemented
GT0740 # 03 Y:2002 03 2002 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $62,171 $130,800 Not Implemented
GT0740 # 04 Y:2002 04 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,365 $0 Not Implemented
GT0740 # 05 Y:2002 05 2002 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,122 $1,000 Not Implemented
GT0740 # 06 Y:2002 06 2002 AUTOMATE FINISHING PROCESS $130,680 $10,300 Not Implemented
GT0740 # 07 Y:2002 07 2002 MINIMIZE WATER USAGE $11,020 $21,250 Not Implemented
GT0736 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,485 $0 Not Implemented
GT0736 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $384 $500 Implemented
GT0736 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN WATER LINES AND VALVES $33,702 $5,000 Implemented
GT0736 # 04 Y:2002 04 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $38,000 $38,000 Not Implemented
GT0736 # 05 Y:2002 05 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,344 $0 Not Implemented
GT0736 # 06 Y:2002 06 2002 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $8,300 $0 Implemented
GT0736 # 07 Y:2002 07 2002 COVER OPEN TANKS $3,121 $6,000 Not Implemented
GT0736 # 08 Y:2002 08 2002 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $44,595 $27,000 Not Implemented