Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0441 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,024 | $37,887 | Implemented |
WV0441 # 09 Y:2012 | 09 | 2012 | OPTIMIZE PLANT POWER FACTOR | $10,618 | $46,340 | Not Implemented |
WV0441 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,022 | $9,275 | Implemented |
WV0441 # 11 Y:2012 | 11 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,115 | $3,000 | Not Implemented |
WV0441 # 12 Y:2012 | 12 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,825 | $12,850 | Not Implemented |
WV0441 # 13 Y:2012 | 13 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,782 | $0 | Implemented |
WV0441 # 14 Y:2012 | 14 | 2012 | IMPROVE LUBRICATION PRACTICES | $2,709 | $3,400 | Not Implemented |
WV0441 # 15 Y:2012 | 15 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,137 | $1,063 | Implemented |
LE0331 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $59,232 | $1,300 | Not Implemented |
LE0331 # 02 Y:2012 | 02 | 2012 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $42,903 | $73,485 | Not Implemented |
LE0331 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,201 | $136,500 | Not Implemented |
LE0331 # 04 Y:2012 | 04 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $24,579 | $0 | Implemented |
LE0331 # 05 Y:2012 | 05 | 2012 | REDESIGN PROCESS | $20,100 | $0 | Implemented |
LE0331 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,156 | $12,800 | Not Implemented |
LE0331 # 07 Y:2012 | 07 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,134 | $2,500 | Implemented |
LE0331 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,005 | $1,000 | Implemented |
LE0331 # 09 Y:2012 | 09 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $805 | $125 | Not Implemented |
DL0078 # 01 Y:2011 | 01 | 2011 | REPLACE BOILER | $123,207 | $900,000 | Not Implemented |
DL0078 # 02 Y:2011 | 02 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $191,452 | $500,000 | Not Implemented |
DL0078 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,553 | $42,800 | Not Implemented |
DL0078 # 04 Y:2011 | 04 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,285 | $28,500 | Not Implemented |
DL0078 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,872 | $165,720 | Not Implemented |
DL0078 # 06 Y:2011 | 06 | 2011 | INSTALL SPECTRAL REFLECTORS / DELAMP | $14,637 | $800 | Not Implemented |
DL0078 # 07 Y:2011 | 07 | 2011 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $77,835 | $42,650 | Implemented |
DL0078 # 08 Y:2011 | 08 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $23,761 | $22,500 | Not Implemented |