IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0385 # 04 Y:2004 04 2004 REPROCESS SPENT OILS ON SITE FOR RE-USE $42,444 $17,685 Not Implemented
AS0385 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $719 $506 Not Implemented
AS0385 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $383 $30 Not Implemented
AS0385 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,939 $60 Not Implemented
AS0385 # 08 Y:2004 08 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $339 $150 Not Implemented
UD0701 # 01 Y:2004 01 2004 REDUCE OR ELIMINATE WASTE $85,956 $19,600 Not Implemented
UD0701 # 02 Y:2004 02 2004 REDUCE EXCESSIVE BOILER BLOWDOWN $55,242 $1,619 Not Implemented
UD0701 # 03 Y:2004 03 2004 METER WASTE WATER $51,851 $15,700 Not Implemented
UD0701 # 04 Y:2004 04 2004 REDUCE OR ELIMINATE WASTE $38,220 $620 Not Implemented
UD0701 # 05 Y:2004 05 2004 REDUCE VENTILATION AIR $22,847 $31,250 Not Implemented
UD0701 # 06 Y:2004 06 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,494 $1,500 Not Implemented
UD0701 # 07 Y:2004 07 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,577 $16,000 Not Implemented
UD0701 # 08 Y:2004 08 2004 REDUCE EXCESSIVE BOILER BLOWDOWN $6,179 $4,000 Not Implemented
UD0701 # 09 Y:2004 09 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,926 $0 Not Implemented
UD0701 # 10 Y:2004 10 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $5,896 $4,800 Not Implemented
UD0701 # 11 Y:2004 11 2004 REPAIR AND ELIMINATE STEAM LEAKS $5,373 $146 Not Implemented
UD0701 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,315 $16,140 Not Implemented
UD0701 # 13 Y:2004 13 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,444 $3,294 Not Implemented
UD0701 # 14 Y:2004 14 2004 DISCONNECT BALLASTS $397 $30 Not Implemented
UD0701 # 15 Y:2004 15 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $386 $174 Not Implemented
UD0701 # 16 Y:2004 16 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $261 $125 Not Implemented
WV0301 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $30,817 $4,062 Implemented
WV0301 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,918 $4,120 Implemented
WV0301 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,529 $14,877 Implemented
WV0301 # 04 Y:2004 04 2004 DEVELOP A REPAIR/REPLACE POLICY $6,476 $360 Implemented