IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0272 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $2,647 $480 Not Implemented
LE0272 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,150 $92,543 Not Implemented
UW0014 # 01 Y:2008 01 2008 USE OPTIMUM THICKNESS INSULATION $118,896 $114,435 Not Implemented
UW0014 # 02 Y:2008 02 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $40,835 $57,573 Implemented
UW0014 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,004 $13,992 Not Implemented
UW0014 # 04 Y:2008 04 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $12,247 $70,905 Not Implemented
UW0014 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,513 $5,640 Not Implemented
UW0014 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $2,327 $1,500 Not Implemented
NC0377 # 01 Y:2008 01 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,484 $2,800 Implemented
NC0377 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,040 $1,000 Implemented
NC0377 # 03 Y:2008 03 2008 DEVELOP A REPAIR/REPLACE POLICY $475 $930 Implemented
NC0377 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $5,415 $11,000 Not Implemented
NC0377 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $595 $100 Implemented
NC0377 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,040 $111,342 Implemented
NC0377 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,691 $1,495 Implemented
BD0347 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,977 $120 Implemented
BD0347 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $4,457 $5,400 Implemented
BD0347 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,032 $2 Not Implemented
BD0347 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,195 $501 Not Implemented
BD0347 # 05 Y:2008 05 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $41,601 $43,021 Not Implemented
BD0347 # 06 Y:2008 06 2008 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $898 $2,101 Not Implemented
BD0347 # 07 Y:2008 07 2008 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,228 $257 Not Implemented
BD0347 # 08 Y:2008 08 2008 USE EVAPORATION TO CONCENTRATE MATERIAL $5,997 $7,996 Not Implemented
UW0013 # 01 Y:2008 01 2008 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $3,676 $593 Not Implemented
UW0013 # 02 Y:2008 02 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,365 $130 Not Implemented