IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0658 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $450 $2,400 Not Implemented
MI0228 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,388 $1,660 Implemented
MI0228 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,589 $24,600 Implemented
MI0228 # 03 Y:2012 03 2012 INSTALL SKYLIGHTS $4,816 $8,484 Not Implemented
MI0228 # 04 Y:2012 04 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,387 $1,400 Implemented
MI0228 # 05 Y:2012 05 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,303 $80 Implemented
MI0228 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,095 $160 Implemented
MI0228 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,686 $80 Implemented
MZ0093 # 01 Y:2012 01 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,525 $1,520 Not Implemented
MZ0093 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,852 $2,800 Implemented
MZ0093 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $1,224 $700 Implemented
MZ0093 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,388 $1,120 Implemented
MZ0093 # 05 Y:2012 05 2012 OPTIMIZE PLANT POWER FACTOR $21,600 $15,000 Not Implemented
MZ0093 # 06 Y:2012 06 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,502 $0 Implemented
NC0456 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $36,693 $65,000 Not Implemented
NC0456 # 02 Y:2012 02 2012 REPAIR OR REPLACE STEAM TRAPS $34,238 $5,500 Implemented
NC0456 # 03 Y:2012 03 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $28,806 $60,000 Not Implemented
NC0456 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $997 $100 Implemented
NC0456 # 05 Y:2012 05 2012 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,045 $5,000 Not Implemented
NC0455 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $17,379 $2,419 Implemented
NC0455 # 02 Y:2012 02 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,681 $1,600 Not Implemented
NC0455 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $294 $383 Not Implemented
NC0455 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,649 $100 Implemented
NC0455 # 05 Y:2012 05 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $452 $50 Not Implemented
NC0455 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $157 $350 Not Implemented