Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0612 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44,735 | $34,020 | n/a |
UF0612 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,865 | $8,523 | n/a |
UF0612 # 06 Y:2024 | 06 | 2024 | INSTALL TURBULATORS | $13,749 | $3,750 | n/a |
UF0612 # 07 Y:2024 | 07 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $9,443 | $21,120 | n/a |
UF0612 # 08 Y:2024 | 08 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $7,481 | $5,900 | n/a |
UF0612 # 09 Y:2024 | 09 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $5,236 | $6,087 | n/a |
UF0612 # 10 Y:2024 | 10 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,066 | $2,320 | n/a |
UF0610 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $108,899 | $322,608 | n/a |
UF0610 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $28,883 | $18,333 | n/a |
UF0610 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,012 | $25,400 | n/a |
UF0610 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $9,119 | $36,000 | n/a |
UF0610 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $4,345 | $2,330 | n/a |
UF0610 # 06 Y:2024 | 06 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,691 | $5,108 | n/a |
UF0610 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,062 | $7,200 | n/a |
UF0610 # 08 Y:2024 | 08 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $1,315 | $4,000 | n/a |
UF0610 # 09 Y:2024 | 09 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $54,895 | $0 | n/a |
UF0610 # 10 Y:2024 | 10 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $15,675 | $25,000 | n/a |
UF0610 # 11 Y:2024 | 11 | 2024 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $4,482 | $3,330 | n/a |
MI0438 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $292,161 | $663,964 | n/a |
MI0438 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $116,907 | $0 | n/a |
MI0438 # 03 Y:2024 | 03 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $52,928 | $1,320 | n/a |
MI0438 # 04 Y:2024 | 04 | 2024 | METER WASTE WATER | $26,088 | $956 | n/a |
MI0438 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,979 | $1,660 | n/a |
MI0438 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,248 | $860 | n/a |
MI0438 # 07 Y:2024 | 07 | 2024 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,582 | $1,027 | n/a |