Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0552 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $608 | $100 | Implemented |
LE0552 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $790 | $570 | Implemented |
LE0552 # 03 Y:2023 | 03 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,712 | $2,500 | Implemented |
LE0552 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $231 | $320 | Implemented |
LE0552 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,342 | $5,052 | Not Implemented |
LE0552 # 06 Y:2023 | 06 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $12,123 | $35,000 | Not Implemented |
LE0552 # 07 Y:2023 | 07 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $448 | $2,100 | Not Implemented |
LE0552 # 08 Y:2023 | 08 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,547 | $10,241 | Not Implemented |
LE0552 # 09 Y:2023 | 09 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,062 | $48,000 | Implemented |
LE0552 # 10 Y:2023 | 10 | 2023 | USE SOLAR HEAT TO HEAT WATER | $20,496 | $210,000 | Not Implemented |
LE0551 # 01 Y:2023 | 01 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $69,768 | $5,000 | Implemented |
LE0551 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $203 | $300 | Not Implemented |
LE0551 # 03 Y:2023 | 03 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $111,339 | $525,000 | Implemented |
LE0550 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,663 | $100 | Implemented |
LE0550 # 02 Y:2023 | 02 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,474 | $2,500 | Implemented |
LE0550 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,539 | $3,500 | Implemented |
LE0550 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $299 | $1,150 | Not Implemented |
LE0550 # 05 Y:2023 | 05 | 2023 | ELIMINATE A BY-PRODUCT | $85,450 | $350,000 | Implemented |
LE0550 # 06 Y:2023 | 06 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,500 | $22,000 | Not Implemented |
LE0550 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,791 | $34,566 | Implemented |
LE0549 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,236 | $2,600 | Implemented |
LE0549 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,466 | $8,000 | Implemented |
LE0549 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $251 | $1,200 | Implemented |
LE0549 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,374 | $56,502 | Implemented |
LE0549 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,405 | $420,000 | Not Implemented |