IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,500

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0633 # 02 Y:2019 02 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $31,254 $27,000 Implemented
NC0633 # 03 Y:2019 03 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $920 $500 Not Implemented
NC0633 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,540 $10,000 Not Implemented
NC0633 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $1,338 $5,000 Not Implemented
NC0626 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,564 $40,273 Implemented
NC0626 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $532 $871 Not Implemented
NC0626 # 03 Y:2019 03 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $240 $45 Not Implemented
NC0626 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,034 $135 Implemented
NC0626 # 05 Y:2019 05 2019 RECOVER WASTE HEAT FROM EQUIPMENT $2,962 $4,000 Not Implemented
NC0626 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,170 $9,000 Not Implemented
NC0626 # 07 Y:2019 07 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,977 $200 Implemented
NC0617 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,647 $16,472 Implemented
NC0617 # 02 Y:2018 02 2018 USE PHOTOCELL CONTROLS $1,341 $450 Implemented
NC0617 # 03 Y:2018 03 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $352 $90 Implemented
NC0617 # 04 Y:2018 04 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,137 $12,000 Implemented
NC0617 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $300 $1,250 Not Implemented
NC0617 # 06 Y:2018 06 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,162 $50,000 Implemented
NC0611 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,179 $92,653 Implemented
NC0611 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,370 $200 Implemented
NC0611 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,064 $100 Not Implemented
NC0611 # 04 Y:2018 04 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,227 $35,000 Not Implemented
NC0611 # 05 Y:2018 05 2018 DEVELOP A REPAIR/REPLACE POLICY $2,887 $5,685 Implemented
NC0611 # 06 Y:2018 06 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,662 $200 Implemented
NC0609 # 01 Y:2018 01 2018 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $9,405 $0 Not Implemented
NC0609 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,593 $8,972 Implemented