Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0633 # 02 Y:2019 | 02 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $31,254 | $27,000 | Implemented |
NC0633 # 03 Y:2019 | 03 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $920 | $500 | Not Implemented |
NC0633 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,540 | $10,000 | Not Implemented |
NC0633 # 05 Y:2019 | 05 | 2019 | OPTIMIZE PLANT POWER FACTOR | $1,338 | $5,000 | Not Implemented |
NC0626 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,564 | $40,273 | Implemented |
NC0626 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $532 | $871 | Not Implemented |
NC0626 # 03 Y:2019 | 03 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $240 | $45 | Not Implemented |
NC0626 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,034 | $135 | Implemented |
NC0626 # 05 Y:2019 | 05 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,962 | $4,000 | Not Implemented |
NC0626 # 06 Y:2019 | 06 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,170 | $9,000 | Not Implemented |
NC0626 # 07 Y:2019 | 07 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,977 | $200 | Implemented |
NC0617 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,647 | $16,472 | Implemented |
NC0617 # 02 Y:2018 | 02 | 2018 | USE PHOTOCELL CONTROLS | $1,341 | $450 | Implemented |
NC0617 # 03 Y:2018 | 03 | 2018 | INSTALL / REPAIR INSULATION ON STEAM LINES | $352 | $90 | Implemented |
NC0617 # 04 Y:2018 | 04 | 2018 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,137 | $12,000 | Implemented |
NC0617 # 05 Y:2018 | 05 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $300 | $1,250 | Not Implemented |
NC0617 # 06 Y:2018 | 06 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,162 | $50,000 | Implemented |
NC0611 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $58,179 | $92,653 | Implemented |
NC0611 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,370 | $200 | Implemented |
NC0611 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,064 | $100 | Not Implemented |
NC0611 # 04 Y:2018 | 04 | 2018 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $7,227 | $35,000 | Not Implemented |
NC0611 # 05 Y:2018 | 05 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $2,887 | $5,685 | Implemented |
NC0611 # 06 Y:2018 | 06 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,662 | $200 | Implemented |
NC0609 # 01 Y:2018 | 01 | 2018 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $9,405 | $0 | Not Implemented |
NC0609 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,593 | $8,972 | Implemented |