IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,150

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0175 # 02 Y:1983 02 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,977 $4,000 Not Implemented
TN0175 # 03 Y:1983 03 1983 INSTALL SET-BACK TIMERS $520 $0 Not Implemented
TN0176 # 01 Y:1983 01 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $28,124 $5,000 Not Implemented
TN0178 # 01 Y:1983 01 1983 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,560 $500 Not Implemented
TN0178 # 02 Y:1983 02 1983 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $586 $500 Not Implemented
TN0178 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $3,070 $0 Not Implemented
TN0180 # 01 Y:1983 01 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $21,000 $600 Implemented
TN0180 # 02 Y:1983 02 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $450 $100 Implemented
TN0180 # 03 Y:1983 03 1983 REDUCE VENTILATION AIR $3,500 $200 Implemented
TN0184 # 01 Y:1983 01 1983 IMPROVE LUBRICATION PRACTICES $1,670 $4,200 Not Implemented
TN0184 # 02 Y:1983 02 1983 TURN OFF EQUIPMENT WHEN NOT IN USE $2,420 $0 Not Implemented
TN0185 # 01 Y:1983 01 1983 OPTIMIZE PLANT POWER FACTOR $260 $3,200 Not Implemented
TN0185 # 02 Y:1983 02 1983 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $360 $0 Not Implemented
TN0185 # 03 Y:1983 03 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,000 $2,000 Not Implemented
TN0187 # 01 Y:1983 01 1983 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $-14,400 $10,000 Not Implemented
TN0187 # 02 Y:1983 02 1983 ADJUST VENTS TO MINIMIZE ENERGY USE $1,540 $0 Not Implemented
TN0187 # 03 Y:1983 03 1983 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $265 $0 Not Implemented
TN0189 # 01 Y:1983 01 1983 OPTIMIZE PLANT POWER FACTOR $530 $4,000 Not Implemented
TN0189 # 02 Y:1983 02 1983 UPGRADE OBSOLETE EQUIPMENT $540 $60 Not Implemented
UD0100 # 01 Y:1983 01 1983 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,030 $1,000 Implemented
UD0100 # 02 Y:1983 02 1983 INSTALL STORM WINDOWS AND DOORS $5,208 $2,000 Implemented
UD0100 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,279 $4,668 Implemented
UD0100 # 04 Y:1983 04 1983 INSTALL TIMERS AND/OR THERMOSTATS $7,768 $2,000 Implemented
UD0100 # 05 Y:1983 05 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $263 $1,590 Not Implemented
UD0101 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,400 $28,821 Not Implemented