IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0288 # 06 Y:2001 06 2001 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $720,000 $559,440 Not Implemented
UF0288 # 07 Y:2001 07 2001 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $169,000 $176,000 Implemented
UF0288 # 08 Y:2001 08 2001 INSTALL BACK-UP EQUIPMENT $29,400 $64,000 Implemented
GT0721 # 01 Y:2001 01 2001 RECOVER WASTE HEAT FROM EQUIPMENT $12,360 $5,050 n/a
GT0721 # 02 Y:2001 02 2001 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $25,375 $0 n/a
GT0721 # 03 Y:2001 03 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $38,845 $80,000 n/a
GT0721 # 04 Y:2001 04 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $705 $60 n/a
GT0721 # 05 Y:2001 05 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $28,530 $15,000 n/a
GT0721 # 06 Y:2001 06 2001 AUTOMATE FINISHING PROCESS $806,400 $3,500,000 n/a
MA0502 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,860 $45,850 Not Implemented
MA0502 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $17,998 $40,000 Not Implemented
MA0502 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,461 $6,200 Not Implemented
MA0502 # 04 Y:2001 04 2001 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,510 $15,000 Not Implemented
MA0502 # 05 Y:2001 05 2001 REPLACE BOILER $1,908 $1,908 Not Implemented
MA0502 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,771 $3,000 Not Implemented
OK0629 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $947 $308 Implemented
OK0629 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,735 $180 Implemented
OK0629 # 03 Y:2001 03 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $193,540 $25,975 Not Implemented
OK0629 # 04 Y:2001 04 2001 AIR CONDITION ONLY SPACE NECESSARY $4,536 $400 Implemented
OK0629 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $190 $0 Not Implemented
OK0629 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $495 $374 Not Implemented
OK0629 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $392 $627 Not Implemented
SU0120 # 01 Y:2001 01 2001 PAY BILLS ON TIME TO AVOID LATE FEES $1,106 $0 Implemented
SU0120 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $2,537 $8,750 Not Implemented
SU0120 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $188 $30 Not Implemented