Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0288 # 06 Y:2001 | 06 | 2001 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $720,000 | $559,440 | Not Implemented |
UF0288 # 07 Y:2001 | 07 | 2001 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $169,000 | $176,000 | Implemented |
UF0288 # 08 Y:2001 | 08 | 2001 | INSTALL BACK-UP EQUIPMENT | $29,400 | $64,000 | Implemented |
GT0721 # 01 Y:2001 | 01 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,360 | $5,050 | n/a |
GT0721 # 02 Y:2001 | 02 | 2001 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $25,375 | $0 | n/a |
GT0721 # 03 Y:2001 | 03 | 2001 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $38,845 | $80,000 | n/a |
GT0721 # 04 Y:2001 | 04 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $705 | $60 | n/a |
GT0721 # 05 Y:2001 | 05 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $28,530 | $15,000 | n/a |
GT0721 # 06 Y:2001 | 06 | 2001 | AUTOMATE FINISHING PROCESS | $806,400 | $3,500,000 | n/a |
MA0502 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,860 | $45,850 | Not Implemented |
MA0502 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,998 | $40,000 | Not Implemented |
MA0502 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,461 | $6,200 | Not Implemented |
MA0502 # 04 Y:2001 | 04 | 2001 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $2,510 | $15,000 | Not Implemented |
MA0502 # 05 Y:2001 | 05 | 2001 | REPLACE BOILER | $1,908 | $1,908 | Not Implemented |
MA0502 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,771 | $3,000 | Not Implemented |
OK0629 # 01 Y:2001 | 01 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $947 | $308 | Implemented |
OK0629 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,735 | $180 | Implemented |
OK0629 # 03 Y:2001 | 03 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $193,540 | $25,975 | Not Implemented |
OK0629 # 04 Y:2001 | 04 | 2001 | AIR CONDITION ONLY SPACE NECESSARY | $4,536 | $400 | Implemented |
OK0629 # 05 Y:2001 | 05 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $190 | $0 | Not Implemented |
OK0629 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $495 | $374 | Not Implemented |
OK0629 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $392 | $627 | Not Implemented |
SU0120 # 01 Y:2001 | 01 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,106 | $0 | Implemented |
SU0120 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $2,537 | $8,750 | Not Implemented |
SU0120 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $188 | $30 | Not Implemented |