IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0071 # 06 Y:2003 06 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,367 $0 Implemented
IC0071 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $553 $0 Implemented
IC0071 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $11,135 $0 Implemented
IC0071 # 09 Y:2003 09 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,477 $5,700 Implemented
IC0071 # 10 Y:2003 10 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $339 $1,887 Implemented
CO0535 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,840 $6,420 Not Implemented
CO0535 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,820 $6,420 Implemented
CO0535 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,160 $15,760 Implemented
CO0535 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,340 $750 Implemented
CO0535 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,250 $9,690 Implemented
CO0535 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $1,100 $2,820 Not Implemented
CO0535 # 07 Y:2003 07 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $670 $1,210 Not Implemented
CO0535 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $411 $112 Implemented
CO0535 # 09 Y:2003 09 2003 MODIFY WORKLOAD $30,340 $6,600 Not Implemented
NC0273 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $705 $500 Not Implemented
NC0273 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $232 $83 Implemented
NC0273 # 03 Y:2003 03 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $65 $0 Implemented
NC0273 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $51 $104 Not Implemented
NC0273 # 05 Y:2003 05 2003 USE PHOTOCELL CONTROLS $137 $200 Not Implemented
NC0273 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $879 $390 Implemented
OR0444 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $967,810 $181,200 Implemented
OR0444 # 02 Y:2003 02 2003 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $30,800 $2,000 Not Implemented
OR0444 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,210 $8,170 Implemented
OR0444 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,600 $18,610 Not Implemented
OR0443 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $563,900 $520,900 n/a