Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0071 # 06 Y:2003 | 06 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,367 | $0 | Implemented |
IC0071 # 07 Y:2003 | 07 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $553 | $0 | Implemented |
IC0071 # 08 Y:2003 | 08 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,135 | $0 | Implemented |
IC0071 # 09 Y:2003 | 09 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,477 | $5,700 | Implemented |
IC0071 # 10 Y:2003 | 10 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $339 | $1,887 | Implemented |
CO0535 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $30,840 | $6,420 | Not Implemented |
CO0535 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,820 | $6,420 | Implemented |
CO0535 # 03 Y:2003 | 03 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $7,160 | $15,760 | Implemented |
CO0535 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,340 | $750 | Implemented |
CO0535 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,250 | $9,690 | Implemented |
CO0535 # 06 Y:2003 | 06 | 2003 | INSULATE BARE EQUIPMENT | $1,100 | $2,820 | Not Implemented |
CO0535 # 07 Y:2003 | 07 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $670 | $1,210 | Not Implemented |
CO0535 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $411 | $112 | Implemented |
CO0535 # 09 Y:2003 | 09 | 2003 | MODIFY WORKLOAD | $30,340 | $6,600 | Not Implemented |
NC0273 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $705 | $500 | Not Implemented |
NC0273 # 02 Y:2003 | 02 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $232 | $83 | Implemented |
NC0273 # 03 Y:2003 | 03 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $65 | $0 | Implemented |
NC0273 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $51 | $104 | Not Implemented |
NC0273 # 05 Y:2003 | 05 | 2003 | USE PHOTOCELL CONTROLS | $137 | $200 | Not Implemented |
NC0273 # 06 Y:2003 | 06 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $879 | $390 | Implemented |
OR0444 # 01 Y:2003 | 01 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $967,810 | $181,200 | Implemented |
OR0444 # 02 Y:2003 | 02 | 2003 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $30,800 | $2,000 | Not Implemented |
OR0444 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,210 | $8,170 | Implemented |
OR0444 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,600 | $18,610 | Not Implemented |
OR0443 # 01 Y:2003 | 01 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $563,900 | $520,900 | n/a |