IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0387 # 01 Y:1997 01 1997 RECOVER WASTE HEAT FROM EQUIPMENT $6,360 $8,400 Implemented
CO0387 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,130 $1,500 Implemented
CO0387 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $289 $288 Implemented
CO0387 # 04 Y:1997 04 1997 REPAIR AND ELIMINATE STEAM LEAKS $670 $140 Implemented
CO0387 # 05 Y:1997 05 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $380 $430 Implemented
CO0387 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $220 $290 Implemented
CO0387 # 07 Y:1997 07 1997 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $18,030 $4,000 Implemented
CO0387 # 08 Y:1997 08 1997 INSTALL BACK-UP EQUIPMENT $33,500 $90,000 Implemented
CO0387 # 09 Y:1997 09 1997 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $15,600 $21,000 Implemented
CO0386 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,204 $7,390 Not Implemented
CO0386 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,310 $540 Not Implemented
CO0386 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $960 $380 Not Implemented
CO0386 # 04 Y:1997 04 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $490 $1,870 Not Implemented
CO0386 # 05 Y:1997 05 1997 USE MORE EFFICIENT ADHESIVE APPLICATORS $16,000 $30,000 Not Implemented
CO0386 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $250 $0 Not Implemented
CO0386 # 07 Y:1997 07 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $156,000 $7,470 Not Implemented
CO0386 # 08 Y:1997 08 1997 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $9,540 $1,350 Not Implemented
CO0385 # 01 Y:1997 01 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,360 $6,100 Implemented
CO0385 # 02 Y:1997 02 1997 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,510 $400 Implemented
CO0385 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,180 $320 Implemented
CO0385 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $197 $322 Implemented
CO0385 # 05 Y:1997 05 1997 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $6,410 $13,700 Implemented
CO0385 # 06 Y:1997 06 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,370 $420 Implemented
CO0385 # 07 Y:1997 07 1997 CONVERT TO ELECTROSTATIC POWDER COATING $105,860 $99,400 Implemented
CO0385 # 08 Y:1997 08 1997 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $8,650 $10,000 Not Implemented