IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0168 # 08 Y:1995 08 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $550 $0 Implemented
ME0168 # 09 Y:1995 09 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $411 $400 Not Implemented
ME0168 # 10 Y:1995 10 1995 CLOSE OFF UNNEEDED STEAM LINES $12,433 $0 Not Implemented
ME0168 # 11 Y:1995 11 1995 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $4,998 $3,500 Not Implemented
ME0168 # 12 Y:1995 12 1995 MINIMIZE WATER USAGE $4,333 $1,300 Implemented
ME0168 # 13 Y:1995 13 1995 MINIMIZE WATER USAGE $1,618 $440 Implemented
MS0035 # 01 Y:1995 01 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $817 $50 Implemented
MS0035 # 02 Y:1995 02 1995 OPTIMIZE PLANT POWER FACTOR $5,164 $2,130 Implemented
MS0035 # 03 Y:1995 03 1995 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $11,921 $12,146 Not Implemented
MS0035 # 04 Y:1995 04 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $678 $20 Not Implemented
MS0035 # 05 Y:1995 05 1995 INSTALL TIMERS AND/OR THERMOSTATS $2,158 $5,000 Not Implemented
MS0035 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,824 $4,949 Not Implemented
MS0035 # 07 Y:1995 07 1995 RECOVER WASTE HEAT FROM EQUIPMENT $18,198 $32,850 Not Implemented
NC0066 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,066 $260 Implemented
NC0066 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $112 $330 Implemented
NC0066 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $229 $1,120 Implemented
NC0066 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $487 $330 Implemented
NC0066 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $188 $198 Not Implemented
NC0066 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,500 $0 Not Implemented
NC0066 # 07 Y:1995 07 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,368 $30,845 Not Implemented
NC0066 # 08 Y:1995 08 1995 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,705 $1,806 Implemented
NC0066 # 09 Y:1995 09 1995 INSULATE BARE EQUIPMENT $1,888 $500 Not Implemented
NC0067 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,790 $360 Implemented
NC0067 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,315 $1,122 Implemented
NC0067 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,692 $919 Implemented