IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0004 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,674 $974 Not Implemented
UA0004 # 03 Y:2007 03 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,587 $0 Implemented
UA0004 # 04 Y:2007 04 2007 INSTALL TIMERS AND/OR THERMOSTATS $435 $1,534 Not Implemented
UA0004 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,488 $1,400 Not Implemented
UA0004 # 06 Y:2007 06 2007 SHUT OFF PILOTS IN STANDBY EQUIPMENT $2,169 $230 Implemented
UA0004 # 07 Y:2007 07 2007 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $5,479 $400 Not Implemented
UA0004 # 08 Y:2007 08 2007 UPGRADE OBSOLETE EQUIPMENT $47,141 $67,908 Not Implemented
UA0004 # 09 Y:2007 09 2007 USE OPTIMUM THICKNESS INSULATION $17,420 $1,926 Not Implemented
UA0004 # 10 Y:2007 10 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,180 $2,897 Not Implemented
UA0004 # 11 Y:2007 11 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,282 $0 Not Implemented
UA0003 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $166 $158 Not Implemented
UA0003 # 01 Y:2007 01 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $65,640 $16,926 Not Implemented
UA0003 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,585 $54,205 Not Implemented
UA0003 # 03 Y:2007 03 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $43,286 $20,950 Not Implemented
UA0003 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,528 $0 Not Implemented
UA0003 # 05 Y:2007 05 2007 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,563 $0 Not Implemented
UA0003 # 06 Y:2007 06 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,422 $0 Not Implemented
UA0003 # 07 Y:2007 07 2007 INSTALL TIMERS AND/OR THERMOSTATS $814 $1,180 Not Implemented
UA0002 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $20,117 $824 Not Implemented
UA0002 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $34,488 $1,462 Not Implemented
UA0002 # 03 Y:2007 03 2007 REPAIR AND ELIMINATE STEAM LEAKS $35,628 $600 Implemented
UA0002 # 04 Y:2007 04 2007 METER WASTE WATER $6,725 $0 Not Implemented
UA0002 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,648 $15,057 Not Implemented
UA0002 # 06 Y:2007 06 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $11,078 $3,916 Implemented
UA0001 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,286 $252 Not Implemented