IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,529

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0731 # 03 Y:2002 03 2002 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $3,094 $0 Not Implemented
GT0731 # 04 Y:2002 04 2002 COMBINE UTILITY METERS $5,560 $0 Implemented
GT0731 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,538 $0 Not Implemented
GT0731 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN WATER LINES AND VALVES $140 $330 Implemented
GT0731 # 07 Y:2002 07 2002 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $12,802 $1,500 Not Implemented
GT0731 # 08 Y:2002 08 2002 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $3,265 $2,500 Implemented
GT0731 # 09 Y:2002 09 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,091 $3,500 Implemented
GT0731 # 10 Y:2002 10 2002 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $29,536 $16,300 Not Implemented
GT0731 # 11 Y:2002 11 2002 COVER OPEN TANKS $31,387 $36,639 Not Implemented
GT0731 # 12 Y:2002 12 2002 MODIFY DYE BECK $22,904 $73,150 Not Implemented
GT0731 # 13 Y:2002 13 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $77,662 $80,000 Not Implemented
GT0730 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $725 $330 Implemented
GT0730 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,760 $21,000 Not Implemented
GT0730 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,409 $4,000 Not Implemented
GT0730 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $756 $270 Implemented
GT0730 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $31,900 $150,000 Not Implemented
GT0730 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $4,840 $250 Implemented
GT0730 # 07 Y:2002 07 2002 PAY UTILITY BILLS ON TIME $993 $0 Implemented
GT0727 # 01 Y:2002 01 2002 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $563,200 $1,563,200 Not Implemented
GT0727 # 02 Y:2002 02 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,807,000 $0 Implemented
GT0727 # 03 Y:2002 03 2002 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,527,000 $4,140,000 Not Implemented
GT0727 # 04 Y:2002 04 2002 REDESIGN PROCESS $2,159,550 $0 Implemented
GT0727 # 05 Y:2002 05 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $165,202 $0 Not Implemented
GT0727 # 06 Y:2002 06 2002 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $679,000 $250,000 Not Implemented
GT0727 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $147,500 $181,000 Not Implemented