IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,193

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0273 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,256 $975 Implemented
UM0273 # 03 Y:2005 03 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,423 $2,450 Not Implemented
UM0273 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,373 $3,897 Implemented
UM0273 # 05 Y:2005 05 2005 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $897 $420 Implemented
UM0273 # 06 Y:2005 06 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $681 $1,000 Not Implemented
IC0093 # 01 Y:2004 01 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,168 $3,600 Implemented
IC0093 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,864 $89,448 Not Implemented
IC0093 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,546 $700 Implemented
IC0093 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $737 $0 Implemented
IC0093 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,595 $34,679 Not Implemented
IC0093 # 06 Y:2004 06 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $803 $300 Not Implemented
IC0093 # 07 Y:2004 07 2004 UPGRADE OBSOLETE EQUIPMENT $1,895 $8,597 Not Implemented
UM0271 # 01 Y:2004 01 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $542,255 $2,000,000 Not Implemented
UM0271 # 02 Y:2004 02 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $145,057 $125,000 Not Implemented
UM0271 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $46,000 $46,000 Not Implemented
UM0271 # 04 Y:2004 04 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $24,731 $30,000 Not Implemented
UM0271 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,485 $27,143 Not Implemented
UM0271 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,777 $975 Not Implemented
UM0271 # 07 Y:2004 07 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,064 $1,921 Not Implemented
UM0271 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $1,412 $828 Not Implemented
UM0265 # 01 Y:2004 01 2004 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $105,689 $64,000 n/a
UM0265 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $30,525 $30,000 n/a
UM0265 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,733 $15,532 n/a
UM0265 # 04 Y:2004 04 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $11,886 $30,000 n/a
UM0265 # 05 Y:2004 05 2004 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $6,581 $10,000 n/a