IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0318 # 06 Y:2005 06 2005 COVER OPEN TANKS $5,974 $12,120 Not Implemented
WV0318 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $4,198 $330 Implemented
WV0318 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,582 $11,537 Not Implemented
WV0318 # 09 Y:2005 09 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,258 $360 Implemented
WV0318 # 10 Y:2005 10 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,532 $5,220 Implemented
MI0110 # 01 Y:2005 01 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $122,911 $75,000 Not Implemented
MI0110 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $117,785 $2,470 Not Implemented
MI0110 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $49,464 $16,000 Not Implemented
MI0110 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,676 $1,110 Not Implemented
MI0110 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $845 $780 Not Implemented
IC0104 # 01 Y:2005 01 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,653 $1,200 Implemented
IC0104 # 02 Y:2005 02 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,264 $100 Implemented
IC0104 # 03 Y:2005 03 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $18,925 $50,000 Not Implemented
IC0104 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $22,421 $119,810 Implemented
IC0104 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,110 $0 Implemented
IC0104 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,948 $2,100 Implemented
IC0104 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,510 $0 Implemented
IC0104 # 08 Y:2005 08 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,843 $107,641 Implemented
IC0104 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,662 $13,166 Implemented
IC0104 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $659 $800 Implemented
TA0099 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $26,045 $2,079 Not Implemented
TA0099 # 02 Y:2005 02 2005 FILTER AND REUSE HYDRAULIC OIL $25,230 $6,200 Not Implemented
TA0099 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,435 $11,735 Not Implemented
TA0099 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,725 $55 Not Implemented
TA0099 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,090 $600 Not Implemented