IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0326 # 07 Y:2007 07 2007 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $14,867 $5,500 Not Implemented
BD0326 # 08 Y:2007 08 2007 MODIFY STARTUP/SHUTDOWN TIMES $2,400 $7,000 Not Implemented
BD0326 # 09 Y:2007 09 2007 RECOVER AND REUSE WASTE MATERIAL $512 $0 Not Implemented
BD0326 # 10 Y:2007 10 2007 REPAIR AND ELIMINATE STEAM LEAKS $270 $150 Not Implemented
IC0127 # 01 Y:2007 01 2007 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,659 $0 Implemented
IC0127 # 02 Y:2007 02 2007 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $800 $440 Implemented
IC0127 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,063 $51,889 Implemented
IC0127 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $120 $1,026 Implemented
IC0127 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,459 $0 Implemented
IC0127 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,336 $20,976 Implemented
IC0127 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $3,818 $886 Implemented
IC0127 # 08 Y:2007 08 2007 REPAIR AND ELIMINATE STEAM LEAKS $2,137 $1,000 Implemented
IC0127 # 09 Y:2007 09 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,282 $0 Implemented
IC0127 # 10 Y:2007 10 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $22,675 $50,711 Implemented
OK0746 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $32,026 $30,757 Implemented
OK0746 # 02 Y:2007 02 2007 USE SOLAR HEAT FOR HEAT $26,050 $140,000 Not Implemented
OK0746 # 03 Y:2007 03 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $52,302 $14,800 Not Implemented
OK0746 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,580 $4,541 Implemented
OK0746 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,287 $3,000 Implemented
OK0746 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,881 $3,256 Implemented
OK0746 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,881 $0 Implemented
OK0746 # 08 Y:2007 08 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $39,725 $63,500 Not Implemented
OK0746 # 09 Y:2007 09 2007 OPERATE BOILERS ON HIGH FIRE SETTING $49,382 $46,200 Not Implemented
OK0746 # 10 Y:2007 10 2007 OPERATE BOILERS ON HIGH FIRE SETTING $40,383 $400 Not Implemented
OK0746 # 11 Y:2007 11 2007 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $30,387 $15,000 Not Implemented