Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0505 # 08 Y:2015 | 08 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,549 | $0 | Not Implemented |
WV0505 # 09 Y:2015 | 09 | 2015 | INSTALL SET-BACK TIMERS | $2,219 | $1,175 | Not Implemented |
WV0505 # 10 Y:2015 | 10 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,063 | $35 | Implemented |
WV0505 # 11 Y:2015 | 11 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,699 | $672 | Implemented |
WV0505 # 12 Y:2015 | 12 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $786 | $179 | Not Implemented |
UD0926 # 01 Y:2015 | 01 | 2015 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $10,310 | $0 | Not Implemented |
UD0926 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,258 | $0 | Implemented |
UD0926 # 03 Y:2015 | 03 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $21,384 | $1,000 | Not Implemented |
UD0926 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,287 | $0 | Implemented |
UD0926 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,076 | $100 | Implemented |
UD0926 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,913 | $2,050 | Not Implemented |
UD0926 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,162 | $5,000 | Not Implemented |
UD0926 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,106 | $31,264 | Not Implemented |
UD0926 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,575 | $2,300 | Implemented |
UD0926 # 10 Y:2015 | 10 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,792 | $6,100 | Not Implemented |
UD0926 # 11 Y:2015 | 11 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $20,362 | $80,000 | Not Implemented |
UD0925 # 03 Y:2015 | 03 | 2015 | USE OPTIMUM TEMPERATURE | $46,665 | $0 | Not Implemented |
UD0925 # 04 Y:2015 | 04 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $4,804 | $34,000 | Not Implemented |
UD0925 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,759 | $5,000 | Not Implemented |
UD0925 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,964 | $1,000 | Implemented |
UD0925 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,405 | $66,200 | Not Implemented |
UD0925 # 08 Y:2015 | 08 | 2015 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $7,714 | $120,000 | Implemented |
UD0925 # 09 Y:2015 | 09 | 2015 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $5,400 | $0 | Not Implemented |
UD0925 # 01 Y:2015 | 01 | 2015 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $860 | $0 | Implemented |
UD0925 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $221,454 | $15,345 | Not Implemented |