IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0250 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $751 $383 Implemented
OK0250 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,029 $4,418 Implemented
OK0250 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $186 $291 Implemented
OK0250 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,089 $0 Implemented
OK0250 # 06 Y:1988 06 1988 INSTALL TIMERS AND/OR THERMOSTATS $15,230 $5,100 Not Implemented
MA0116 # 01 Y:1988 01 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,841 $320 Not Implemented
MA0116 # 02 Y:1988 02 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $435 $515 Not Implemented
MA0116 # 03 Y:1988 03 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,585 $0 Not Implemented
MA0116 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,632 $1,450 Not Implemented
MA0116 # 05 Y:1988 05 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $9,500 $7,500 Not Implemented
OK0249 # 01 Y:1988 01 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $956 $0 Not Implemented
OK0249 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,980 $0 Implemented
OK0249 # 03 Y:1988 03 1988 INSTALL TIMERS AND/OR THERMOSTATS $1,682 $1,800 Implemented
OK0249 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $209 $490 Implemented
OK0249 # 05 Y:1988 05 1988 INSTALL SET-BACK TIMERS $104 $0 Not Implemented
KU0244 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,442 $9,509 Implemented
KU0244 # 02 Y:1988 02 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,665 $0 Implemented
KU0244 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,434 $2,355 Not Implemented
KU0244 # 04 Y:1988 04 1988 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,359 $2,400 Implemented
KU0244 # 05 Y:1988 05 1988 RECOVER WASTE HEAT FROM EQUIPMENT $404 $125 Implemented
KU0244 # 06 Y:1988 06 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $324 $0 Implemented
KU0244 # 07 Y:1988 07 1988 INSTALL AUTOMATIC STACK DAMPER $178 $275 Implemented
KU0244 # 08 Y:1988 08 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $174 $10 Not Implemented
KU0244 # 09 Y:1988 09 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $114 $0 Implemented
KU0245 # 01 Y:1988 01 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,489 $50,000 Implemented