Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0104 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,923 | $3,729 | Not Implemented |
UA0104 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,107 | $100 | Not Implemented |
UA0104 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,956 | $1,800 | Not Implemented |
BD0430 # 01 Y:2013 | 01 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $7,450 | $22,500 | Not Implemented |
BD0430 # 02 Y:2013 | 02 | 2013 | USE PHOTOCELL CONTROLS | $2,289 | $200 | Not Implemented |
BD0430 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,001 | $3,520 | Not Implemented |
BD0430 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $741 | $25 | Not Implemented |
BD0430 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $397 | $200 | Not Implemented |
BD0430 # 06 Y:2013 | 06 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $278 | $600 | Not Implemented |
BD0430 # 07 Y:2013 | 07 | 2013 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $4,500 | $10,000 | Implemented |
TT0108 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,126 | $10,709 | Implemented |
TT0108 # 02 Y:2013 | 02 | 2013 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $5,367 | $8,075 | Not Implemented |
TT0108 # 03 Y:2013 | 03 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,110 | $1,110 | Not Implemented |
TT0108 # 04 Y:2013 | 04 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $4,000 | $980 | Implemented |
MA0711 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,618 | $35,000 | Not Implemented |
MA0711 # 02 Y:2013 | 02 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,430 | $25,000 | Not Implemented |
MA0711 # 03 Y:2013 | 03 | 2013 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $6,314 | $14,000 | Not Implemented |
MA0711 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,170 | $2,000 | Implemented |
MA0711 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,165 | $4,055 | Implemented |
MI0244 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,762 | $68,060 | Not Implemented |
MI0244 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,361 | $1,800 | Implemented |
MI0244 # 03 Y:2013 | 03 | 2013 | INSTALL SKYLIGHTS | $3,415 | $2,780 | Implemented |
MI0244 # 04 Y:2013 | 04 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,133 | $2,600 | Not Implemented |
MI0244 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,214 | $80 | Implemented |
MI0244 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,120 | $3,520 | Not Implemented |