IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0104 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,923 $3,729 Not Implemented
UA0104 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,107 $100 Not Implemented
UA0104 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,956 $1,800 Not Implemented
BD0430 # 01 Y:2013 01 2013 USE RADIANT HEATER FOR SPOT HEATING $7,450 $22,500 Not Implemented
BD0430 # 02 Y:2013 02 2013 USE PHOTOCELL CONTROLS $2,289 $200 Not Implemented
BD0430 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,001 $3,520 Not Implemented
BD0430 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $741 $25 Not Implemented
BD0430 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $397 $200 Not Implemented
BD0430 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $278 $600 Not Implemented
BD0430 # 07 Y:2013 07 2013 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $4,500 $10,000 Implemented
TT0108 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,126 $10,709 Implemented
TT0108 # 02 Y:2013 02 2013 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $5,367 $8,075 Not Implemented
TT0108 # 03 Y:2013 03 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,110 $1,110 Not Implemented
TT0108 # 04 Y:2013 04 2013 REPAIR AND ELIMINATE STEAM LEAKS $4,000 $980 Implemented
MA0711 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,618 $35,000 Not Implemented
MA0711 # 02 Y:2013 02 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,430 $25,000 Not Implemented
MA0711 # 03 Y:2013 03 2013 MODERATE COOLING TOWER OUTLET TEMPERATURE $6,314 $14,000 Not Implemented
MA0711 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,170 $2,000 Implemented
MA0711 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,165 $4,055 Implemented
MI0244 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,762 $68,060 Not Implemented
MI0244 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $4,361 $1,800 Implemented
MI0244 # 03 Y:2013 03 2013 INSTALL SKYLIGHTS $3,415 $2,780 Implemented
MI0244 # 04 Y:2013 04 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,133 $2,600 Not Implemented
MI0244 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,214 $80 Implemented
MI0244 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,120 $3,520 Not Implemented