IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,529

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0721 # 04 Y:2001 04 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $705 $60 n/a
GT0721 # 05 Y:2001 05 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $28,530 $15,000 n/a
GT0721 # 06 Y:2001 06 2001 AUTOMATE FINISHING PROCESS $806,400 $3,500,000 n/a
GT0720 # 01 Y:2001 01 2001 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $337 $1,000 Implemented
GT0720 # 02 Y:2001 02 2001 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,475 $600 Implemented
GT0720 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $467 $943 Not Implemented
GT0720 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,472 $6,151 Implemented
GT0720 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $277 $324 Implemented
GT0720 # 06 Y:2001 06 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $658 $982 Not Implemented
GT0720 # 07 Y:2001 07 2001 REDUCE EXCESSIVE BOILER BLOWDOWN $1,320 $50 Implemented
GT0720 # 08 Y:2001 08 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,740 $0 Not Implemented
GT0720 # 09 Y:2001 09 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $93,750 $1,700 Not Implemented
GT0719 # 01 Y:2001 01 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $80,000 $125,000 n/a
GT0719 # 02 Y:2001 02 2001 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $18,750 $1,500 n/a
GT0719 # 03 Y:2001 03 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $44,105 $12,500 n/a
GT0719 # 04 Y:2001 04 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $30,490 $8,220 n/a
GT0719 # 05 Y:2001 05 2001 INSTALL TIMERS AND/OR THERMOSTATS $467 $400 n/a
GT0719 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,740 $900 n/a
GT0718 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,000 $0 n/a
GT0718 # 02 Y:2001 02 2001 COMBINE UTILITY METERS $2,360 $0 n/a
GT0718 # 03 Y:2001 03 2001 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $645 $0 n/a
GT0718 # 04 Y:2001 04 2001 UPGRADE CONTROLS ON COMPRESSORS $1,625 $7,000 n/a
GT0718 # 05 Y:2001 05 2001 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $35,705 $3,500 n/a
GT0718 # 06 Y:2001 06 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $99,000 $80,000 n/a
GT0718 # 07 Y:2001 07 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $12,400 $30,000 n/a