IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0015 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,264 $800 Implemented
LM0015 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,982 $0 Not Implemented
LM0015 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,965 $12,950 Not Implemented
LM0015 # 06 Y:2001 06 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $100,699 $450 Not Implemented
LM0015 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,944 $11,800 Implemented
LM0015 # 08 Y:2001 08 2001 $207,000 $1,000 Not Implemented
LM0015 # 09 Y:2001 09 2001 $7,300 $0 Implemented
LM0015 # 10 Y:2001 10 2001 $104,000 $24,000 Implemented
UU0008 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,523 $125 Implemented
UU0008 # 02 Y:2001 02 2001 USE SYNTHETIC LUBRICANT $423 $400 Implemented
UU0008 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,204 $460 Implemented
UU0008 # 04 Y:2001 04 2001 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $5,102 $2,600 Implemented
UU0008 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,236 $1,844 Not Implemented
NC0219 # 01 Y:2001 01 2001 $22,148 $70,000 Not Implemented
NC0219 # 02 Y:2001 02 2001 ADJUST BURNERS FOR EFFICIENT OPERATION $33,380 $800 Implemented
NC0219 # 03 Y:2001 03 2001 REPAIR OR REPLACE STEAM TRAPS $35,343 $5,500 Not Implemented
NC0219 # 04 Y:2001 04 2001 INCREASE AMOUNT OF CONDENSATE RETURNED $60,106 $92,100 n/a
NC0219 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $199 $1,000 Not Implemented
OK0624 # 01 Y:2001 01 2001 AIR CONDITION ONLY SPACE NECESSARY $2,978 $130 Not Implemented
OK0624 # 02 Y:2001 02 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $4,484 $255 Implemented
OK0624 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,627 $240 Implemented
OK0624 # 04 Y:2001 04 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,170 $50,000 Not Implemented
OK0624 # 05 Y:2001 05 2001 $131,000 $92,000 Implemented
OK0624 # 06 Y:2001 06 2001 $200,000 $200,000 Not Implemented
AS0302 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $872 $2,853 n/a