IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122,146

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0108 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,126 $10,709 Implemented
TT0108 # 02 Y:2013 02 2013 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $5,367 $8,075 Not Implemented
TT0108 # 03 Y:2013 03 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,110 $1,110 Not Implemented
TT0108 # 04 Y:2013 04 2013 REPAIR AND ELIMINATE STEAM LEAKS $4,000 $980 Implemented
UM0425 # 01 Y:2013 01 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,900 $13,000 Not Implemented
UM0425 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,480 $3,300 Implemented
UM0425 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,115 $0 Implemented
UM0425 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,752 $5,000 Implemented
UM0425 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $695 $308 Implemented
OK0856 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $1,284 $1,725 Not Implemented
OK0856 # 02 Y:2013 02 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,800 $11,700 Not Implemented
OK0856 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $750 Implemented
OK0856 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,300 $550 Not Implemented
MA0710 # 01 Y:2013 01 2013 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $132,553 $324,000 Not Implemented
MA0710 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,966 $10,580 Implemented
MA0710 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,915 $10,580 Implemented
MA0710 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,884 $7,500 Not Implemented
MA0710 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,460 $6,400 Not Implemented
MA0710 # 06 Y:2013 06 2013 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $3,796 $1,000 Not Implemented
MA0710 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,115 $2,705 Implemented
SU0346 # 01 Y:2013 01 2013 USE SYNTHETIC LUBRICANT $24,796 $0 Implemented
SU0346 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $119 $0 Implemented
SU0346 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,608 $780 Not Implemented
SU0346 # 04 Y:2013 04 2013 UPGRADE OBSOLETE EQUIPMENT $304 $1,295 Implemented
SU0346 # 05 Y:2013 05 2013 DISCONNECT BALLASTS $4,434 $21,152 Implemented