IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0733 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $260 $271 Implemented
AM0733 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,290 $1,720 Implemented
GT0899 # 01 Y:2017 01 2017 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $108,707 $1,008 Not Implemented
GT0899 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,187 $1,000 Implemented
GT0899 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $29,097 $4,967 Implemented
GT0899 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,882 $10,400 Not Implemented
GT0899 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $8,883 $9,708 Implemented
GT0899 # 06 Y:2017 06 2017 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $205,713 $445,437 Not Implemented
TT0191 # 01 Y:2017 01 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $33,156 $94,000 Implemented
TT0191 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $4,274 $3,000 Not Implemented
TT0191 # 03 Y:2017 03 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,861 $10,500 Not Implemented
TT0191 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $3,453 $8,274 Implemented
TT0191 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $1,175 $250 Implemented
NL0005 # 01 Y:2017 01 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $106,860 $650,000 Not Implemented
NL0005 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,435 $57,984 Not Implemented
NL0005 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,055 $60,000 Not Implemented
NL0005 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $800 $6,424 Implemented
UA0180 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,799 $2,645 Implemented
UA0180 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,724 $3,250 Not Implemented
UA0180 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,029 $400 Not Implemented
UA0180 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,573 $25,654 Not Implemented
UA0180 # 05 Y:2017 05 2017 MODIFY STARTUP/SHUTDOWN TIMES $2,873 $0 Not Implemented
UA0180 # 06 Y:2017 06 2017 PAY BILLS ON TIME TO AVOID LATE FEES $296 $0 Implemented
UA0180 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $327 $735 Implemented
UA0180 # 08 Y:2017 08 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $240 $50 Implemented