IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0549 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $73,018 $68,138 Not Implemented
UF0549 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,001 $2,904 Implemented
UF0549 # 04 Y:2020 04 2020 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $492,292 $1,875,550 Not Implemented
DL0181 # 01 Y:2020 01 2020 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $32,510 $0 Implemented
DL0181 # 02 Y:2020 02 2020 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,480 $1,500 Implemented
DL0181 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,540 $10,000 Not Implemented
DL0181 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $4,970 $6,500 Not Implemented
DL0181 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,490 $87,516 Implemented
DL0181 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,150 $3,146 Implemented
DL0181 # 07 Y:2020 07 2020 RECOVER WASTE HEAT FROM EQUIPMENT $3,480 $10,375 Implemented
WV0590 # 01 Y:2020 01 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $42,278 $44,000 Not Implemented
WV0590 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,451 $66,168 Implemented
WV0590 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $24,406 $31,200 Not Implemented
WV0590 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $16,468 $5,109 Implemented
WV0590 # 05 Y:2020 05 2020 RECOVER AND REUSE WASTE MATERIAL $13,855 $12,500 Not Implemented
WV0590 # 06 Y:2020 06 2020 UPGRADE CONTROLS ON COMPRESSORS $9,428 $15,500 Not Implemented
WV0590 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,881 $1,468 Implemented
WV0590 # 08 Y:2020 08 2020 RECYCLE WHITE WATER $3,957 $8,600 Not Implemented
WV0590 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,957 $813 Implemented
WV0590 # 10 Y:2020 10 2020 OPTIMIZE PLANT POWER FACTOR $2,899 $8,000 Not Implemented
WV0590 # 11 Y:2020 11 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $1,693 $1,000 Implemented
WV0590 # 12 Y:2020 12 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $100 Implemented
WV0590 # 13 Y:2020 13 2020 DEVELOP A REPAIR/REPLACE POLICY $101 $271 Implemented
UF0548 # 01 Y:2020 01 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $27,216 $0 Implemented
UF0548 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,699 $74,548 Implemented