IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,704

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0367 # 11 Y:2010 11 2010 INSULATE BARE EQUIPMENT $7,420 $3,130 Not Implemented
BD0367 # 12 Y:2010 12 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,145 $3,600 Not Implemented
BD0367 # 13 Y:2010 13 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,993 $39,800 Not Implemented
BD0367 # 14 Y:2010 14 2010 MINIMIZE WATER USAGE $1,884 $3,920 Not Implemented
BD0366 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $9,620 $210 Implemented
BD0366 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,837 $2,700 Implemented
BD0366 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,342 $1,000 Not Implemented
BD0366 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,922 $0 Not Implemented
BD0366 # 05 Y:2010 05 2010 IMPROVE LUBRICATION PRACTICES $2,368 $600 Implemented
BD0366 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,606 $3,000 Not Implemented
BD0366 # 07 Y:2010 07 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $21,299 $18,000 n/a
BD0366 # 08 Y:2010 08 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,581 $6,400 Implemented
BD0366 # 09 Y:2010 09 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $565 $0 Not Implemented
IC0167 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,950 $19,296 Not Implemented
IC0167 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,522 $458 Implemented
IC0167 # 03 Y:2009 03 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,193 $0 Implemented
IC0167 # 04 Y:2009 04 2009 REPAIR AND ELIMINATE STEAM LEAKS $875 $400 Implemented
IC0167 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,524 $1,260 Implemented
IC0167 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $137 $115 Implemented
IC0167 # 07 Y:2009 07 2009 UPGRADE CONTROLS ON COMPRESSORS $3,067 $8,134 Implemented
IC0167 # 08 Y:2009 08 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $452 $0 Not Implemented
IC0165 # 01 Y:2009 01 2009 $35 $81 Not Implemented
IC0165 # 02 Y:2009 02 2009 $56 $152 Not Implemented
IC0165 # 03 Y:2009 03 2009 $3,581 $0 Implemented
IC0165 # 04 Y:2009 04 2009 $573 $575 Implemented