IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,776

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0695 # 03 Y:2000 03 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $50,645 $5,075 n/a
TN0695 # 04 Y:2000 04 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $28,960 $52,400 n/a
TN0695 # 05 Y:2000 05 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $26,200 $18,500 n/a
TN0695 # 06 Y:2000 06 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,730 $1,175 n/a
TN0695 # 07 Y:2000 07 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,015 $21,850 n/a
TN0695 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,245 $0 n/a
TN0695 # 09 Y:2000 09 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,800 $5,510 n/a
TN0695 # 10 Y:2000 10 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $2,880 $1,850 n/a
TN0695 # 11 Y:2000 11 2000 INSTALL TIMERS AND/OR THERMOSTATS $2,160 $2,820 n/a
AR0191 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,022 $1,877 Implemented
AR0191 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,105 $1,590 Not Implemented
AR0191 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $582 $0 Not Implemented
AR0191 # 04 Y:2000 04 2000 USE MAGNETIC TECHNOLOGY TO TREAT WATER $12,000 $10,374 Implemented
AR0191 # 05 Y:2000 05 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $74,880 $80,000 Not Implemented
AR0191 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $95,071 $13,210 Implemented
TN0693 # 01 Y:2000 01 2000 MODIFY CURRENT INCENTIVE PROGRAM $77,500 $35,600 Not Implemented
TN0693 # 02 Y:2000 02 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $69,815 $1,200 Implemented
TN0693 # 03 Y:2000 03 2000 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $22,100 $8,120 Implemented
TN0693 # 04 Y:2000 04 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,000 $35,070 Implemented
TN0693 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,176 $379 Not Implemented
TN0693 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,508 $18,900 Not Implemented
TN0693 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,503 $900 Not Implemented
TN0693 # 08 Y:2000 08 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,357 $490 Implemented
TN0693 # 09 Y:2000 09 2000 RECOVER AND REUSE WASTE MATERIAL $750 $570 Not Implemented
TN0691 # 01 Y:2000 01 2000 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $144,950 $100,000 Not Implemented