Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143,081
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0663 # 11 Y:2025 | 11 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,593 | $35,000 | n/a |
IC0318 # 01 Y:2025 | 01 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $11,344 | $4,184 | n/a |
IC0318 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,649 | $4,909 | n/a |
IC0318 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $833 | $781 | n/a |
IC0318 # 04 Y:2025 | 04 | 2025 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $1,776,306 | $9,581,351 | n/a |
IC0318 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,255 | $8,951 | n/a |
IC0318 # 06 Y:2025 | 06 | 2025 | REPLACE BOILER | $133,316 | $376,143 | n/a |
IC0318 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $2,756 | $391 | n/a |
IC0318 # 08 Y:2025 | 08 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $688 | $63 | n/a |
IC0318 # 09 Y:2025 | 09 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $62,936 | $159,045 | n/a |
IC0318 # 10 Y:2025 | 10 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $74,545 | $10,174 | n/a |
IC0318 # 11 Y:2025 | 11 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,250 | $1,159 | n/a |
IC0318 # 12 Y:2025 | 12 | 2025 | Install Anaerobic Digester | $1,786,748 | $9,930,710 | n/a |
LS0325 # 01 Y:2025 | 01 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,309 | $0 | n/a |
LS0325 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $2,040 | $325 | n/a |
LS0325 # 03 Y:2025 | 03 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $3,063 | $2,380 | n/a |
LS0325 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,806 | $4,618 | n/a |
UL2417 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,561 | $524,124 | n/a |
UL2417 # 02 Y:2024 | 02 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $12,753 | $43,234 | n/a |
UL2417 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,850 | $39,000 | n/a |
UL2417 # 04 Y:2024 | 04 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,595 | $5,797 | n/a |
UL2417 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $463 | $0 | n/a |
UL2417 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,025 | $525 | n/a |
UL2417 # 07 Y:2024 | 07 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $900 | $0 | n/a |
UL2417 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $438 | $941 | n/a |