IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0397 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $874 $681 Not Implemented
MA0397 # 05 Y:1997 05 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $790 $404 Implemented
MA0397 # 06 Y:1997 06 1997 ADD AREA LIGHTING SWITCHES $413 $60 Not Implemented
MA0397 # 07 Y:1997 07 1997 PAY BILLS ON TIME TO AVOID LATE FEES $433 $0 Implemented
UM0092 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,141 $4,497 Not Implemented
UM0092 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,616 $29,553 Not Implemented
UM0092 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $696 $1,000 Not Implemented
UM0092 # 04 Y:1997 04 1997 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $35,249 $8,500 Not Implemented
UM0092 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $1,392 $5,361 Not Implemented
UM0092 # 06 Y:1997 06 1997 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $245,000 $10,000 Not Implemented
UM0092 # 07 Y:1997 07 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,512 $300 Not Implemented
UM0091 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,010 $1,307 Not Implemented
UM0091 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,671 $12,962 Not Implemented
UM0091 # 03 Y:1997 03 1997 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,775 $90 Not Implemented
UM0091 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $624 $600 Not Implemented
UM0091 # 05 Y:1997 05 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $90,870 $30,000 Not Implemented
BD0089 # 01 Y:1997 01 1997 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,860 $5,500 Not Implemented
BD0089 # 02 Y:1997 02 1997 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,615 $1,250 Not Implemented
BD0089 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,151 $1,151 Implemented
BD0089 # 04 Y:1997 04 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $867 $325 Implemented
BD0089 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $777 $0 Not Implemented
BD0089 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $668 $525 Not Implemented
BD0089 # 07 Y:1997 07 1997 RECOVER AND REUSE COOLING WATER $5,285 $4,500 Implemented
BD0089 # 08 Y:1997 08 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,881 $500 Not Implemented
BD0089 # 09 Y:1997 09 1997 ELIMINATE SHIFT $22,880 $2,500 Implemented