IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0015 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $7,093 $380 Implemented
IP0015 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,795 $8,625 Implemented
IP0015 # 08 Y:2013 08 2013 OPTIMIZE PLANT POWER FACTOR $10,702 $17,052 Not Implemented
IP0015 # 09 Y:2013 09 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,144 $3,702 Not Implemented
MZ0118 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,135 $24,628 Implemented
MZ0118 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $3,261 $1,020 Not Implemented
MZ0118 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,880 $950 Implemented
MZ0118 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,699 $0 Implemented
MZ0118 # 05 Y:2013 05 2013 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $10,146 $59,000 Not Implemented
MZ0118 # 06 Y:2013 06 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,418 $0 Implemented
MZ0118 # 07 Y:2013 07 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,099 $0 Not Implemented
MZ0118 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $247 $100 Implemented
MZ0118 # 09 Y:2013 09 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $50 $0 Implemented
MZ0118 # 10 Y:2013 10 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $21 $60 Implemented
MZ0118 # 11 Y:2013 11 2013 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $702 $9,752 Implemented
MZ0121 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,992 $0 Not Implemented
MZ0121 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $16,550 $1,370 Not Implemented
MZ0121 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $6,064 $5,148 Implemented
MZ0121 # 04 Y:2013 04 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $5,476 $5,441 Implemented
MZ0121 # 05 Y:2013 05 2013 USE SYNTHETIC LUBRICANT $4,308 $56 Implemented
MZ0121 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,138 $1,336 Implemented
MZ0121 # 07 Y:2013 07 2013 INSTALL TIMERS AND/OR THERMOSTATS $4,131 $480 Not Implemented
MZ0121 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,019 $19 Not Implemented
MZ0121 # 09 Y:2013 09 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,088 $351 Implemented
MZ0121 # 10 Y:2013 10 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $2,406 $740 Implemented