Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0915 # 11 Y:2015 11 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,720 $3,060 Implemented
OK0915 # 12 Y:2015 12 2015 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $2,345 $5,403 Not Implemented
OK0915 # 13 Y:2015 13 2015 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $12,313 $21,480 Not Implemented
OK0915 # 14 Y:2015 14 2015 OPTIMIZE PLANT POWER FACTOR $9,371 $14,014 Not Implemented
OK0913 # 01 Y:2015 01 2015 INSTALL OCCUPANCY SENSORS $6,606 $2,673 Not Implemented
OK0913 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,311 $1,578 Not Implemented
OK0913 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,931 $23,184 Not Implemented
OK0913 # 04 Y:2015 04 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,806 $1,000 Implemented
OK0913 # 05 Y:2015 05 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,525 $9,000 Not Implemented
OK0913 # 06 Y:2015 06 2015 UPGRADE CONTROLS ON COMPRESSORS $1,330 $85 Not Implemented
OK0913 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $399 $133 Implemented
OK0913 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $137 $0 Not Implemented
SF0468 # 01 Y:2015 01 2015 REPAIR AND ELIMINATE STEAM LEAKS $3,541 $0 Implemented
SF0468 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,328 $0 Not Implemented
SF0468 # 03 Y:2015 03 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,761 $0 Implemented
SF0468 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,358 $455 Not Implemented
SF0468 # 05 Y:2015 05 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,141 $1,658 Implemented
SF0468 # 06 Y:2015 06 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,031 $8,158 Implemented
SF0468 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $356 $274 Implemented
SF0468 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $2,043 $1,679 Implemented
SF0468 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,506 $8,348 Implemented
SF0468 # 10 Y:2015 10 2015 REPLACE BOILER $9,878 $51,914 Implemented
MI0280 # 01 Y:2015 01 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,699 $1,400 Implemented
MI0280 # 02 Y:2015 02 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,149 $2,100 Implemented
MI0280 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,428 $1,660 Implemented