IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,317

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0088 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $2,734 $252 Implemented
WV0088 # 08 Y:1996 08 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $240 $1,000 Not Implemented
WV0084 # 01 Y:1996 01 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,160 $800 Implemented
WV0084 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $570 $10,840 Implemented
WV0084 # 03 Y:1996 03 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $746 $2,000 Implemented
WV0084 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $480 $275 Not Implemented
WV0084 # 05 Y:1996 05 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $907 $40 Implemented
WV0084 # 06 Y:1996 06 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,138 $0 Implemented
WV0084 # 07 Y:1996 07 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $638 $1,000 Not Implemented
WV0084 # 08 Y:1996 08 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $646 $1,450 Not Implemented
WV0084 # 09 Y:1996 09 1996 INSULATE BARE EQUIPMENT $331 $453 Implemented
WV0084 # 10 Y:1996 10 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,712 $5,120 Not Implemented
WV0080 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,917 $1,514 Implemented
WV0080 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,089 $11,740 Implemented
WV0080 # 03 Y:1996 03 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,111 $1,240 Implemented
WV0080 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $650 $580 Not Implemented
WV0080 # 05 Y:1996 05 1996 USE SYNTHETIC LUBRICANT $1,580 $1,100 Implemented
WV0080 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $585 $150 Implemented
WV0080 # 07 Y:1996 07 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,162 $1,612 Not Implemented
WV0080 # 08 Y:1996 08 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,196 $4,800 Implemented
WV0080 # 09 Y:1996 09 1996 INSULATE BARE EQUIPMENT $116 $278 Implemented
WV0080 # 10 Y:1996 10 1996 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,167 $2,450 Not Implemented
WV0080 # 11 Y:1996 11 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $19,781 $11,500 Not Implemented
WV0080 # 12 Y:1996 12 1996 USE ALTERNATIVE FLOCCULENT TO MINIMIZE SLUDGE VOLUME $13,000 $66,000 Not Implemented
WV0080 # 13 Y:1996 13 1996 USE PLASTIC PALLETS INSTEAD OF WOOD $22,914 $20,240 Implemented