Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,666
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0035 # 09 Y:2009 | 09 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $3,810 | $2,210 | Implemented |
UA0035 # 10 Y:2009 | 10 | 2009 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $40,375 | $77,000 | Implemented |
UA0035 # 11 Y:2009 | 11 | 2009 | UPGRADE CONTROLS ON COMPRESSORS | $26,217 | $10,000 | Not Implemented |
UM0350 # 01 Y:2009 | 01 | 2009 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $14,346 | $12,800 | Not Implemented |
UM0350 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,487 | $13,000 | Implemented |
UM0350 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,300 | $1,500 | Not Implemented |
UM0350 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,744 | $30,000 | Implemented |
UM0350 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,990 | $100 | Not Implemented |
UM0350 # 06 Y:2009 | 06 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,186 | $10,960 | Not Implemented |
UM0350 # 07 Y:2009 | 07 | 2009 | INSULATE BARE EQUIPMENT | $846 | $474 | Not Implemented |
UM0350 # 08 Y:2009 | 08 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $649 | $1,200 | Implemented |
MA0647 # 01 Y:2009 | 01 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,325 | $30,000 | Not Implemented |
MA0647 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,543 | $1,200 | Implemented |
MA0647 # 03 Y:2009 | 03 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $458 | $0 | Not Implemented |
MA0647 # 04 Y:2009 | 04 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $372 | $400 | Not Implemented |
LE0284 # 01 Y:2009 | 01 | 2009 | UPGRADE OBSOLETE EQUIPMENT | $42,827 | $30,000 | Not Implemented |
LE0284 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $26,473 | $20,000 | Not Implemented |
LE0284 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,124 | $8,000 | Not Implemented |
LE0284 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,628 | $1,760 | Implemented |
LE0284 # 05 Y:2009 | 05 | 2009 | USE SOLAR HEAT TO HEAT WATER | $7,038 | $28,000 | Not Implemented |
LE0284 # 06 Y:2009 | 06 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,526 | $8,000 | Not Implemented |
LE0284 # 07 Y:2009 | 07 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,560 | $7,000 | Not Implemented |
LE0284 # 08 Y:2009 | 08 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,911 | $320 | Implemented |
LE0284 # 09 Y:2009 | 09 | 2009 | REPAIR OR REPLACE STEAM TRAPS | $2,855 | $2,000 | Implemented |
LE0284 # 10 Y:2009 | 10 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,713 | $224 | Implemented |