IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0547 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $234,675 $218,100 Implemented
UF0547 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,816 $17,893 Implemented
UF0547 # 03 Y:2020 03 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,426 $0 Implemented
UA0223 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $965 $562 Implemented
UA0223 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,828 $1,395 Implemented
UA0223 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,686 $250 Not Implemented
UA0223 # 04 Y:2020 04 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $1,536 $3,806 Not Implemented
GT0942 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,227 $1,450 Implemented
GT0942 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,618 $2,500 Implemented
GT0942 # 03 Y:2020 03 2020 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $14,945 $4,781 Not Implemented
GT0942 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,179 $71,763 Not Implemented
GT0942 # 05 Y:2020 05 2020 MINIMIZE WATER USAGE $3,202 $5,700 Not Implemented
GT0942 # 06 Y:2020 06 2020 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $113,048 $690,000 Not Implemented
GT0942 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $114,607 $699,103 Not Implemented
BS0135 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $148 $400 Not Implemented
BS0135 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $698 $362 Not Implemented
BS0135 # 03 Y:2020 03 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,828 $21,800 Not Implemented
DL0180 # 01 Y:2020 01 2020 REDUCE VENTILATION AIR $26,710 $0 Implemented
DL0180 # 02 Y:2020 02 2020 INSTALL TIMERS AND/OR THERMOSTATS $980 $120 Implemented
DL0180 # 03 Y:2020 03 2020 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,450 $400 Implemented
DL0180 # 04 Y:2020 04 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,160 $1,600 Not Implemented
DL0180 # 05 Y:2020 05 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,970 $5,800 Not Implemented
DL0180 # 06 Y:2020 06 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,050 $4,000 Not Implemented
DL0180 # 07 Y:2020 07 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $53,460 $2,400 Not Implemented
DL0180 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,080 $1,900 Implemented