Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0547 # 01 Y:2020 | 01 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $234,675 | $218,100 | Implemented |
UF0547 # 02 Y:2020 | 02 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,816 | $17,893 | Implemented |
UF0547 # 03 Y:2020 | 03 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,426 | $0 | Implemented |
UA0223 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $965 | $562 | Implemented |
UA0223 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,828 | $1,395 | Implemented |
UA0223 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,686 | $250 | Not Implemented |
UA0223 # 04 Y:2020 | 04 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,536 | $3,806 | Not Implemented |
GT0942 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $20,227 | $1,450 | Implemented |
GT0942 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,618 | $2,500 | Implemented |
GT0942 # 03 Y:2020 | 03 | 2020 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $14,945 | $4,781 | Not Implemented |
GT0942 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,179 | $71,763 | Not Implemented |
GT0942 # 05 Y:2020 | 05 | 2020 | MINIMIZE WATER USAGE | $3,202 | $5,700 | Not Implemented |
GT0942 # 06 Y:2020 | 06 | 2020 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $113,048 | $690,000 | Not Implemented |
GT0942 # 07 Y:2020 | 07 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $114,607 | $699,103 | Not Implemented |
BS0135 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $148 | $400 | Not Implemented |
BS0135 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $698 | $362 | Not Implemented |
BS0135 # 03 Y:2020 | 03 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,828 | $21,800 | Not Implemented |
DL0180 # 01 Y:2020 | 01 | 2020 | REDUCE VENTILATION AIR | $26,710 | $0 | Implemented |
DL0180 # 02 Y:2020 | 02 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $980 | $120 | Implemented |
DL0180 # 03 Y:2020 | 03 | 2020 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $1,450 | $400 | Implemented |
DL0180 # 04 Y:2020 | 04 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,160 | $1,600 | Not Implemented |
DL0180 # 05 Y:2020 | 05 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,970 | $5,800 | Not Implemented |
DL0180 # 06 Y:2020 | 06 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,050 | $4,000 | Not Implemented |
DL0180 # 07 Y:2020 | 07 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $53,460 | $2,400 | Not Implemented |
DL0180 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,080 | $1,900 | Implemented |