Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0663 # 07 Y:2003 | 07 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $26,035 | $2,100 | Not Implemented |
OK0662 # 01 Y:2003 | 01 | 2003 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $832 | $3,222 | Not Implemented |
OK0662 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $181 | $300 | Not Implemented |
OK0662 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,135 | $3,289 | Not Implemented |
OK0662 # 04 Y:2003 | 04 | 2003 | INSULATE BARE EQUIPMENT | $406 | $221 | Not Implemented |
OK0662 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $165 | $864 | Not Implemented |
OK0662 # 06 Y:2003 | 06 | 2003 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,326 | $23,100 | n/a |
OK0662 # 07 Y:2003 | 07 | 2003 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,701 | $1,011 | Not Implemented |
OK0662 # 08 Y:2003 | 08 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,730 | $1,000 | Not Implemented |
OK0661 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $72,173 | $0 | Not Implemented |
OK0661 # 02 Y:2003 | 02 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $20,400 | $0 | Implemented |
OK0661 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,245 | $7,483 | Not Implemented |
OK0661 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,319 | $823 | Implemented |
OK0661 # 05 Y:2003 | 05 | 2003 | OPTIMIZE PLANT POWER FACTOR | $1,271 | $3,206 | Not Implemented |
OK0661 # 06 Y:2003 | 06 | 2003 | USE COMPRESSOR AIR FILTERS | $3,339 | $168 | Not Implemented |
OK0661 # 07 Y:2003 | 07 | 2003 | INSTALL OCCUPANCY SENSORS | $441 | $262 | Not Implemented |
OK0661 # 08 Y:2003 | 08 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,061 | $45,000 | Implemented |
OK0661 # 09 Y:2003 | 09 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $11,440 | $2,500 | Implemented |
OK0658 # 01 Y:2003 | 01 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $51,704 | $45,000 | Implemented |
OK0658 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,266 | $0 | Not Implemented |
OK0658 # 03 Y:2003 | 03 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,031 | $0 | Implemented |
OK0658 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,978 | $367 | Implemented |
OK0658 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,150 | $5,273 | Implemented |
OK0658 # 06 Y:2003 | 06 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $30,454 | $60,000 | Not Implemented |
OK0658 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,028 | $117 | Not Implemented |