Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0503 # 04 Y:2015 | 04 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,899 | $500 | Implemented |
WV0503 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,831 | $374 | Implemented |
WV0503 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,499 | $3,530 | Implemented |
WV0503 # 07 Y:2015 | 07 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $915 | $1,000 | Implemented |
WV0503 # 08 Y:2015 | 08 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $407 | $448 | Implemented |
WV0503 # 09 Y:2015 | 09 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $283 | $630 | Implemented |
WV0503 # 10 Y:2015 | 10 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $272 | $1,250 | Not Implemented |
WV0502 # 01 Y:2015 | 01 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $13,685 | $1,000 | Implemented |
WV0502 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,334 | $25,930 | Implemented |
WV0502 # 03 Y:2015 | 03 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $12,681 | $18,000 | Implemented |
WV0502 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,838 | $20,000 | Not Implemented |
WV0502 # 05 Y:2015 | 05 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,333 | $2,500 | Not Implemented |
WV0502 # 06 Y:2015 | 06 | 2015 | OPTIMIZE PLANT POWER FACTOR | $3,830 | $16,400 | Not Implemented |
WV0502 # 07 Y:2015 | 07 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $3,350 | $724 | Implemented |
WV0502 # 08 Y:2015 | 08 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,826 | $500 | Implemented |
WV0502 # 09 Y:2015 | 09 | 2015 | INSULATE BARE EQUIPMENT | $812 | $2,934 | Implemented |
WV0502 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $321 | $854 | Implemented |
UD0921 # 01 Y:2015 | 01 | 2015 | REDUCE VENTILATION AIR | $16,159 | $0 | Implemented |
UD0921 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $405 | $0 | Implemented |
UD0921 # 03 Y:2015 | 03 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $723 | $0 | Not Implemented |
UD0921 # 04 Y:2015 | 04 | 2015 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $381 | $275 | Implemented |
UD0921 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,887 | $950 | Implemented |
UD0921 # 06 Y:2015 | 06 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,838 | $1,250 | Not Implemented |
UD0921 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,470 | $1,000 | Not Implemented |
UD0921 # 08 Y:2015 | 08 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,618 | $700 | Not Implemented |