Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0762 # 08 Y:2003 | 08 | 2003 | INCREASE AMOUNT OF CONDENSATE RETURNED | $18,580 | $19,500 | Not Implemented |
GT0762 # 09 Y:2003 | 09 | 2003 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $711,000 | $500,000 | Implemented |
GT0762 # 10 Y:2003 | 10 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $126,034 | $1,000,000 | Implemented |
GT0762 # 11 Y:2003 | 11 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $210,205 | $2,700,000 | Not Implemented |
AS0360 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,726 | $10,607 | Implemented |
AS0360 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $344 | $1,350 | Not Implemented |
AS0360 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,496 | $30 | Implemented |
AS0360 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $10,463 | $18,810 | n/a |
AS0360 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,253 | $150 | Implemented |
AS0360 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $301 | $616 | Implemented |
AS0360 # 07 Y:2003 | 07 | 2003 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $2,438 | $8,705 | Not Implemented |
WI0447 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $1,938 | $2,600 | Implemented |
WI0447 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $62,019 | $150,000 | Not Implemented |
WI0447 # 02 Y:2003 | 02 | 2003 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $6,058 | $4,500 | Implemented |
WI0447 # 03 Y:2003 | 03 | 2003 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $2,071 | $2,000 | Not Implemented |
WI0447 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $381 | $740 | Not Implemented |
IA0320 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,539 | $449 | Implemented |
IA0320 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,376 | $457 | Not Implemented |
IA0320 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,892 | $25 | Not Implemented |
IA0320 # 04 Y:2003 | 04 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,565 | $7,100 | Not Implemented |
IA0320 # 05 Y:2003 | 05 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $520 | $888 | Implemented |
IA0320 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,629 | $3,694 | Not Implemented |
IA0320 # 07 Y:2003 | 07 | 2003 | USE OPTIMUM THICKNESS INSULATION | $2,436 | $2,132 | Not Implemented |
IA0320 # 08 Y:2003 | 08 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,500 | $0 | Implemented |
IA0320 # 09 Y:2003 | 09 | 2003 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $4,550 | $2,800 | Not Implemented |