IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0450 # 07 Y:2012 07 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $11,389 $6,500 Implemented
WV0450 # 08 Y:2012 08 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,199 $1,000 Not Implemented
WV0450 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,686 $21,120 Not Implemented
WV0450 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,953 $18,267 Implemented
WV0450 # 11 Y:2012 11 2012 DEVELOP A REPAIR/REPLACE POLICY $8,489 $1,210 Implemented
WV0450 # 12 Y:2012 12 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,314 $3,360 Not Implemented
WV0450 # 13 Y:2012 13 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,764 $1,800 Not Implemented
MAS024 # 01 Y:2012 01 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,562 $150 Implemented
MAS024 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,698 $59,484 Not Implemented
MAS024 # 03 Y:2012 03 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,802 $22,500 Not Implemented
MAS024 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $4,676 $2,250 Not Implemented
MAS024 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,749 $0 Implemented
MAS024 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,070 $1,700 Not Implemented
MAS024 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $241 $345 Not Implemented
UMS009 # 01 Y:2012 01 2012 CLOSE OFF UNNEEDED STEAM LINES $3,138,000 $4,845,000 Not Implemented
TT0093 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,234 $10,343 Not Implemented
TT0093 # 02 Y:2012 02 2012 INSTALL WIND POWERED ELECTRIC GENERATOR $29,491 $250,000 Not Implemented
TT0093 # 03 Y:2012 03 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,625 $52,000 Implemented
TT0093 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,350 $800 Implemented
TT0093 # 05 Y:2012 05 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,014 $7,685 Implemented
SU0322 # 01 Y:2012 01 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,386 $0 Implemented
SU0322 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $12,242 $7,179 Not Implemented
SU0322 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $876 $528 Implemented
SU0322 # 04 Y:2012 04 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $109 $298 Not Implemented
SU0322 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $229 $639 Not Implemented