IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1903 # 09 Y:2019 09 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,326 $6,103 n/a
OK1010 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $4,905 $12,400 Implemented
OK1010 # 02 Y:2019 02 2019 INSTALL TIMERS AND/OR THERMOSTATS $7,438 $1,936 Implemented
OK1010 # 03 Y:2019 03 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,032 $947 Implemented
OK1010 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $885 $1,760 Implemented
OK1010 # 05 Y:2019 05 2019 RECOVER WASTE HEAT FROM EQUIPMENT $1,024 $3,948 Not Implemented
OK1010 # 06 Y:2019 06 2019 USE OPTIMUM THICKNESS INSULATION $11,922 $53,750 Not Implemented
OK1010 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,016 $11,730 Not Implemented
SF0538 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $146,044 $0 Not Implemented
SF0538 # 02 Y:2019 02 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $29,680 $12,500 Implemented
SF0538 # 03 Y:2019 03 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $15,353 $5,947 Implemented
SF0538 # 04 Y:2019 04 2019 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $27,526 $16,915 Not Implemented
SF0538 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,440 $7,616 Implemented
SF0538 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,101 $5,998 Implemented
SF0538 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,533 $34,367 Implemented
SF0538 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,565 $11,649 Implemented
SF0538 # 09 Y:2019 09 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $238,211 $1,672,972 Not Implemented
MZ0271 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,858 $5,781 Not Implemented
MZ0271 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $4,334 $980 Implemented
MZ0271 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $586 $360 Not Implemented
MZ0271 # 04 Y:2019 04 2019 USE COMPRESSOR AIR FILTERS $764 $150 Implemented
MZ0271 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,365 $6,600 Not Implemented
GT0924 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,068 $3,500 Implemented
GT0924 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $7,338 $6,225 Not Implemented
GT0924 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $5,577 $13,969 Implemented