Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0658 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,609 $30,876 Implemented
OK0658 # 09 Y:2003 09 2003 INSTALL OCCUPANCY SENSORS $6,270 $2,004 Implemented
OK0658 # 10 Y:2003 10 2003 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $7,445 $0 Not Implemented
OK0654 # 01 Y:2003 01 2003 INSTALL SET-BACK TIMERS $6,206 $744 Not Implemented
OK0654 # 02 Y:2003 02 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,461 $5,880 Not Implemented
OK0654 # 03 Y:2003 03 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,131 $0 Not Implemented
OK0654 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $640 Not Implemented
OK0654 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $336 $349 Not Implemented
OK0654 # 06 Y:2003 06 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $232,400 $2,844 Not Implemented
OK0654 # 07 Y:2003 07 2003 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $1,040 $165 Not Implemented
OK0653 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,530 $6,844 Not Implemented
OK0653 # 02 Y:2003 02 2003 USE OPTIMUM THICKNESS INSULATION $14,697 $8,210 Implemented
OK0653 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,582 $600 Not Implemented
OK0653 # 04 Y:2003 04 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,904 $13,860 Not Implemented
OK0653 # 05 Y:2003 05 2003 INSTALL SET-BACK TIMERS $5,337 $3,280 Not Implemented
OK0653 # 06 Y:2003 06 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $25,432 $4,800 Not Implemented
OK0653 # 07 Y:2003 07 2003 AUTOMATE FINISHING PROCESS $36,680 $73,250 Not Implemented
OK0650 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $1,203 $1,190 Implemented
OK0650 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,073 $100 Implemented
OK0650 # 03 Y:2002 03 2002 USE OPTIMUM THICKNESS INSULATION $56,715 $16,956 n/a
OK0650 # 04 Y:2002 04 2002 PREHEAT COMBUSTION AIR WITH WASTE HEAT $133,632 $206,750 Not Implemented
OK0650 # 05 Y:2002 05 2002 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $4,021,800 $30,000,000 Not Implemented
OK0650 # 06 Y:2002 06 2002 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $1,550,000 $150,000 Not Implemented
OK0651 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,419 $20,491 n/a
OK0651 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,926 $1,360 n/a