IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0261 # 01 Y:2003 01 2003 DEVELOP A REPAIR/REPLACE POLICY $10,483 $9,992 Implemented
NC0261 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $17,622 $2,911 Not Implemented
NC0261 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $13,615 $5,261 Not Implemented
NC0261 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,891 $50 Implemented
NC0261 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,466 $6,430 Implemented
NC0261 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,314 $500 Not Implemented
NC0261 # 07 Y:2003 07 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $910 $3,948 Not Implemented
NC0261 # 08 Y:2003 08 2003 MODIFY CURRENT INCENTIVE PROGRAM $406,000 $41,000 Not Implemented
SF0264 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,947 $18,680 Implemented
SF0264 # 02 Y:2003 02 2003 USE PHOTOCELL CONTROLS $1,323 $960 Implemented
SF0264 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $768 $609 Not Implemented
SF0264 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,123 $17,490 Implemented
SF0264 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,098 $7,305 Not Implemented
SF0264 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $1,307 $3,200 Not Implemented
SF0264 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,167 $16,382 Implemented
SF0264 # 08 Y:2003 08 2003 USE PHOTOCELL CONTROLS $419 $2,640 Implemented
SF0264 # 09 Y:2003 09 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,660 $0 Implemented
SF0264 # 10 Y:2003 10 2003 USE AUTOMATIC CLEANING EQUIPMENT $2,169 $5,391 Not Implemented
SF0264 # 11 Y:2003 11 2003 ELIMINATE/REDUCE AN OPERATION $3,120 $2,865 Not Implemented
SF0264 # 12 Y:2003 12 2003 OPTIMIZE PLANT POWER FACTOR $1,997 $2,695 Not Implemented
SF0264 # 13 Y:2003 13 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $90,568 $162,300 Not Implemented
SF0264 # 14 Y:2003 14 2003 ADOPT IN-HOUSE MATERIAL GENERATION $49,123 $105,624 Not Implemented
LM0064 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,721 $320 Implemented
LM0064 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $76,727 $9,000 n/a
LM0064 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,321 $200 Implemented