IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84,208

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0064 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,721 $320 Implemented
LM0064 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $76,727 $9,000 n/a
LM0064 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,321 $200 Implemented
LM0064 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,099 $9,475 Implemented
LM0064 # 05 Y:2003 05 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $9,529 $0 Not Implemented
LM0064 # 06 Y:2003 06 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $2,520 $0 Implemented
LM0064 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $453 $400 Implemented
LM0064 # 08 Y:2003 08 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,674 $300 Not Implemented
LM0064 # 09 Y:2003 09 2003 DEVELOP STANDARD OPERATING PROCEDURES $123,760 $56,040 n/a
LM0064 # 10 Y:2003 10 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $144,153 $2,500 Not Implemented
LM0064 # 11 Y:2003 11 2003 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $360,180 $118,080 Implemented
LM0064 # 12 Y:2003 12 2003 MODIFY CURRENT INCENTIVE PROGRAM $34,000 $5,000 Implemented
LM0064 # 13 Y:2003 13 2003 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $84,000 $1,000 Not Implemented
MI0060 # 01 Y:2003 01 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $1,444 $513 Implemented
MI0060 # 02 Y:2003 02 2003 REPAIR OR REPLACE STEAM TRAPS $1,282 $57 Implemented
MI0060 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $49,692 $22,500 Not Implemented
MI0060 # 04 Y:2003 04 2003 REDUCE EXCESSIVE BOILER BLOWDOWN $6,768 $4,500 Not Implemented
MI0060 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $943 $1,792 Not Implemented
MI0060 # 06 Y:2003 06 2003 METER WASTE WATER $36,908 $1,950 Implemented
MI0060 # 07 Y:2003 07 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $971 $258 Implemented
NC0261 # 01 Y:2003 01 2003 DEVELOP A REPAIR/REPLACE POLICY $10,483 $9,992 Implemented
NC0261 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $17,622 $2,911 Not Implemented
NC0261 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $13,615 $5,261 Not Implemented
NC0261 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,891 $50 Implemented
NC0261 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,466 $6,430 Implemented