Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,193
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0245 # 03 Y:2004 | 03 | 2004 | INSULATE BARE EQUIPMENT | $7,445 | $3,985 | Not Implemented |
UM0245 # 04 Y:2004 | 04 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $6,060 | $12,288 | Implemented |
UM0245 # 05 Y:2004 | 05 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,670 | $500 | Not Implemented |
UM0245 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,500 | $7,700 | Not Implemented |
UM0245 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,340 | $225 | Implemented |
UM0245 # 08 Y:2004 | 08 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $990 | $1,000 | Not Implemented |
UM0244 # 01 Y:2003 | 01 | 2003 | ADOPT IN-HOUSE MATERIAL GENERATION | $101,745 | $30,000 | Not Implemented |
UM0244 # 02 Y:2003 | 02 | 2003 | SIZE TRUCKS TO JOB | $76,800 | $54,000 | Implemented |
UM0244 # 03 Y:2003 | 03 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $582 | $2,477 | Not Implemented |
UM0244 # 04 Y:2003 | 04 | 2003 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $26,499 | $51,860 | Not Implemented |
UM0244 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $2,023 | $521 | Implemented |
UM0244 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,934 | $13,221 | Not Implemented |
UM0243 # 01 Y:2003 | 01 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $142,452 | $31,500 | Implemented |
UM0243 # 02 Y:2003 | 02 | 2003 | INSULATE BARE EQUIPMENT | $20,715 | $4,565 | Not Implemented |
UM0243 # 03 Y:2003 | 03 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $24,928 | $520 | Implemented |
UM0243 # 04 Y:2003 | 04 | 2003 | AIR CONDITION ONLY SPACE NECESSARY | $13,955 | $6,000 | Implemented |
UM0243 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,857 | $150 | Implemented |
UM0243 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,082 | $100 | Not Implemented |
UM0242 # 01 Y:2003 | 01 | 2003 | INSTALL OCCUPANCY SENSORS | $9,740 | $6,270 | Not Implemented |
UM0242 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,195 | $1,000 | Not Implemented |
UM0242 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,670 | $300 | Not Implemented |
UM0242 # 04 Y:2003 | 04 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,040 | $1,100 | Not Implemented |
UM0242 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $4,180 | $645 | Not Implemented |
UM0242 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,030 | $2,170 | Not Implemented |
UM0241 # 01 Y:2003 | 01 | 2003 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $573,000 | $390,000 | Not Implemented |